Workshop Manuals Factory service & repair Audi
01 Technical data for engines02 4-cylinder TDI engine, 2.0 ltr. 4-valve common rail (EA 288 Gen. I)03 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation III)04 Fuel supply system, petrol engines05 Fuel supply system, diesel engines06 Servicing 7-speed dual clutch gearbox 0AM/0CW07 Rear final drive 0CQ, 0CR08 Servicing 6-speed manual gearbox 02Q, 0BB, 0FB09 6-speed dual clutch gearbox 0D910 6-speed manual gearbox 02Q, 0FB11 6-speed manual gearbox 02S12 7-speed dual clutch gearbox 0CW13 Running gear: Wheel/Tyre Guide14 Brake system15 Running gear, axles, steering16 Heating, air conditioning17 Electrical: Communication18 Electrical system19 General body repairs, exterior20 General body repairs, interior
Audi TT Mk3 (2014-2023)08 · Servicing 6-speed manual gearbox 02Q, 0BB, 0FB
08 · Transmission

Procedure

Make
Audi
Model
TT Mk3
Year
2014–2023
Section
Bevel box › Procedure
Servicing 6-speed manual gearbox 02Q, 0BB, 0FBProcedure

Procedure

Upper wheel housing longitudinal member removed → Chapter

Cutting locations

Remove paint and oxide layer from rivet head and attachment point for earth clamps using compact angle grinder or brush grinder VAS 6446.

A51-11899

Make separating cut at specified location (marking (a)) using body saw.

A51-11900

Using dent removal system VAS 852 001, weld on weld stud VAS 852 001/2 to separate riveted joints (a).

Pull out weld stud VAS 852 001/2 using compact riveter VAS 6792.

A51-11901

Remove remaining material using compact angle grinder.

A51-11902

Replacement parts

  • Service connecting piece 8S0.809.993/994 for inner A-pillar
  • Inner A-pillar
  • Silicate stone D 009 800
  • Aluminium primer DA 009 801
  • Cleaning solution D 009 401 04
  • Pop rivet WHT 005 413 A
  • 2x M8 x 15 mm bolts
  • 2-component epoxy adhesive DA 180 A00 A2

Preparing new part

Make separating cut at specified location (marking (a)) using body saw.

Prepare flanges on new part for bonding and welding.

Roughen bonding surface using a clean sanding disc (grit size P 80 or P 100).

Clean bonding surface with cleaning solution D 009 401 04.

A51-11903

Riveting in

Warning Pre-treatment applies to old flange only.

Use clean brush to remove sanding dust.

Clean bonding surfaces with cleaning solution D 009 401 04.

Treat flanges with silicate stone D 009 800 and holder V.A.G 1931.

Apply a thin coat of aluminium primer DA 009 801 using applicator D 009 500 25 and allow to flash off.

A silicate adhesive layer is formed which ensures long-term durability of the bonded joint. The surface becomes matt.

Apply 2-component epoxy adhesive DA 180 A00 A2 to bonding surface using double cartridge gun VAS 6453.

Set pop rivets WHT 005 413 A using compact riveter VAS 6792.

Drill holes (∅ 8.5 mm) for screw joint in service connecting piece and at markings in casting using drill

Drill holes (∅ 6.8 mm) for riveted joint in service connecting piece and at markings in casting using drill

A51-11904

Rivet in connecting piece with pop rivets WHT 005 413 A using compact riveter VAS 6792.

A51-11905

Secure longitudinal member (part section) with 2 x M8 bolts (a).

A51-11922
Installing upper wheel housing longitudinal member Chapter

Parts & tools for this job For 2014 Audi TT

As an Amazon Associate we earn from qualifying purchases.