Procedure
- Make
- Audi
- Model
- TT Mk3
- Year
- 2014–2023
- Section
- Bevel box › Procedure
Procedure
Side panel already removed → ChapterRemove flow-drill screws using socket for flow-drill screws VAS 852 007 to separate joint (a).
Separate original joint using rechargeable riveter VAS 5279A or compact booster VAS 6790.

Remove remaining material using compact angle grinder.

- B-pillar
- Flow-drill screws WHT.006.547
- Punch riveting
- Cleaning solution D 009 401 04
- 2-component epoxy adhesive DA 001 730 A2
Position new part and fix in place with portal gauge.
Prepare new part for riveting.
Clean bonding surfaces with cleaning solution D 009 401 04.
Prepare bonding area with silicate stone DA 009 800 and clean.
Apply aluminium primer DA 009 801 to bonding surfaces using applicator D 009 500 25 .
Apply 2-component body adhesive DA 001 730 A2 to entire riveting area using pneumatic glue gun V.A.G 2005 B.

Rivet in new part using rechargeable riveter VAS 5279A or compact booster VAS 6790.
Fit flow-drill screws using socket for flow-drill screws VAS 852 007 and secure joint (a).

Parts & tools for this job For 2014 Audi TT
- PARTClutch kitSearch: Audi TT 2014 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Audi TT manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.