bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 602 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 600
Page 16
background image

Heat output flange to approx. 80 

°

C (hot air blower) and fit to

output shaft.

Coat thread and locating face of collar nut (1) with Loctite 243
locking varnish.

Block output flange using special tool 23 0 020.

Tighten collar nut (1) with special tool 23 1 210.

Tightening torque,

refer to Technical Data 23 21 1AZ.

Install arrester and locking balls.

Order:

Locking ball (1), arrester ball (2) and locking pin (3).

Install springs (1) and cylinder pins (2).

Attach cap (1).

Install screws with Loctite 243 screw locking varnish and secure.

RA  Complete removal and installation of input and output shafts (S5D 200G/ 250G)

BMW AG - TIS

23.01.2013  07:12

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 16 -

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 602 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 600