bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

8 RA Replacing Bearings On All Gearshafts (S5D 200G_ 250G) > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 601
Page 17
background image

Install arrester bolt (1) and spring (2).

Note:

Roller (3) must be positioned horizontally.

Install shear-off screw (1) with Loctite 243 locking varnish and
tighten down.

Install the reverse gear switch.

Tightening torque,

refer to Technical Data 61 31 3AZ.

Knock in plug (3).

Installing clutch release mechanism and release lever,

refer to 21 51 500.

RA  Complete removal and installation of input and output shafts (S5D 200G/ 250G)

BMW AG - TIS

23.01.2013  07:12

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 17 -

8 RA Replacing Bearings On All Gearshafts (S5D 200G_ 250G) > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 601