bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 635 > < 2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 633
Page 8
background image

Double taper synchronization:

Connect needle bearing (5).

Install synchronizer ring (6), friction ring (4) and taper ring.

Position 1st gear wheel.

Caution!

Lug (3) must catch in opening (4) and lug (2) must catch in
opening (1).

Coat needle bearing and synchronizer ring on bearing
surfaces with ATF-oil.

Single taper synchronization:

Connect needle bearing (1).

Position synchronizer ring (2) with the lugs (3) to the sliding
blocks.

Note:

Coat needle bearing and synchronizer ring on bearing
surfaces with ATF-oil.

Connect 1st gear wheel (4).

Connect roller bearing (1), 5th gear synchronizer ring (2) and input
shaft to the output shaft (3).

Note:

Coat needle bearing and synchronizer ring on bearing
surfaces with ATF-oil.

Lift off input and output shafts from special tool 23 2 400
and lay to the side.

Layshaft:

3rd/4th gear synchronizing device:

For assembly, insert layshaft in special tool 23 2 400.

Lift out circlip (1).

Installation:

Replace circlip (1).

RA  Detaching and mounting all synchronizing devices S5D 200G/250G

BMW AG - TIS

23.01.2013  07:13

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 8 -

2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 635 > < 2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 633