bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Replacing Wiring Harness At Front Right > < 2 RA Replacing Wiring Harness At Front Left|Page 2311
Page 3
background image

Installation:

The cable ties and foam supports contained in the repair kit are for
securing the repair plugs.

Fit all cut leads of main wiring harness with stop parts. Pin in leads
in accordance with schematic in DIS.

Strip insulation from cable.

Crimp stop parts.

Connect precrimped leads to corresponding plugs (refer to
schematic). Cut off and insulate unpinned leads.

Installation/removal of multiple connector systems.

Replace cable ties that have been cut open.

Installation:

Stick foam supports (1) from repair kit as illustrated to both pipe
carriers.

Secure repair plugs (2) with long cable tie (3) from repair kit to
lower pipe carrier.

RA  Replacing wiring harness at front left

BMW AG - TIS

08.02.2013  12:24

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

3 RA Replacing Wiring Harness At Front Right > < 2 RA Replacing Wiring Harness At Front Left|Page 2311