X Series E70 X5 4.8i (N62TU) OFFRD
Release banjo bolts (1, 2).
Seal air supply unit connections with adhesive tape.
Installation:
Install new screwed connections.
Carefully screw in banjo bolts by hand to avoid damaging the
plastic threads and with it the air supply unit.
Tightening torque 37 12 1AZ
.
After installation:
•
Activate and fill air suspension system
RA Replacing pipes for air springs
BMW AG - TIS
08.02.2013 05:54
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -