Catera V6-3.0L VIN R (1997)
Description
21. Cut the two pretensioner wires leading to the 8-way harness connector, leaving at least 16 cm (6 in) of wire at the connector.
22. Strip 13 mm (0.5 in) of insulation from each of the pretensioner connector wire leads.
23. Cut two 6.1 M (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the deployment
harness.
24. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
25. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power
source until you are ready to deploy the pretensioner.
Description
Description
