CTS V6-3.2L VIN N (2003)
Installation Procedure
1. Install the rack and pinion boot (2).
2. Install a new rack and pinion boot inner clamp (1).
3. Using J 22610 crimp the rack and pinion boot clamp.
4. Install the rack and pinion boot outer clamp.
5. Install the jam nut to the inner tie rod.
6. Position the power steering gear.