Removing - refitting: Coolant outlet housing (/)
- Make
- Citroën
- Model
- C4 Factory Workshop Manual
- Year
- 2004–2010
- Section
- Cooling system › Removing - refitting: Coolant outlet housing (/)
Removing - refitting: Coolant outlet housing (/)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Remove the engine style cover.
Disconnect the battery.
Drain the cooling system.
Disconnect the connector (as "a").
Remove:
- The air turbocharging radiator outlet duct
- The air filter (1) with the air flow sensor
- The battery (2)
Close:
- The inlet manifold
- The air turbocharging radiator
Unclip the connector (/) (as "b").
Disconnect the connector (as "c").
Remove:
- The harness bracket () (as "d"); Unclip the harness support ()
- The coolant pipe support (as "e")
Uncouple: The coolant pipes (3), (4), (5), (6), (7), (8).
Unclip the pipes (9) from the support (14).
CAUTION: The bolt (12) is 10 mm longer.
CAUTION: The studs (11) must be removed in order to uncouple the coolant outlet housing (15) from the coolant inlet manifold pipe.
Remove:
- The 2 mounting nuts (10) (Coolant outlet housing (15))
- The 2 studs (11)
- The 2 bolts (13)
- The (12) bolt
- The bracket (14)
- The thermostat (15)
- The flat seal ()
- The O-ring (Coolant inlet manifold pipe)
2. Refitting
CAUTION: Fit new o-rings.
CAUTION: Refit: Studs (11) pre-coated with product FRENETANCH E6.
Refit: The O-ring (New) (On the coolant inlet manifold pipe).
Position: The flat seal () (New) (On the coolant outlet housing); Using the 2 studs (11) pre-coated with product FRENETANCH E6.
CAUTION: When refitting the coolant outlet housing, check that the new o-ring is positioned correctly on the coolant inlet manifold pipe (as "f"). Risk of pinching.
Refit the coolant outlet housing (15) coupling it to the coolant inlet manifold pipe.
CAUTION: The bolt (12) is 10 mm longer.
Refit:
- The 2 studs (11) pre-coated with product FRENETANCH E6; Tightening to 0,75 ± 0,1 daN.m
- The bracket (14)
- The 2 nuts (10)
- The 2 bolts (13)
- The (12) bolt
Screw in and progressively tighen in cross formation the bolts (13), (12) and the nuts (10); Tightening to 2 ± 0,2 daN.m.
Proceed in the reverse order to removal.
Reconnect the battery.
Perform the operations to be carried out following reconnection of the battery.
Carry out: Filling, bleeding and topping up the cooling circuit to level.
Parts & tools for this job For 2004 Citroën C4
- FLUIDCoolantSearch: Citroën coolant antifreeze
- PARTThermostatSearch: Citroën C4 2004 thermostat
- TOOLCooling system pressure testerSearch: cooling system pressure tester
As an Amazon Associate we earn from qualifying purchases.