Removing - refitting: Engine/gearbox assembly (DW10TD/DW10ATED)
- Make
- Citroën
- Model
- C5 Factory Workshop Manual
- Year
- 2001–2004
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (DW10TD/DW10ATED)
Removing - refitting: Engine/gearbox assembly (DW10TD/DW10ATED)
ESSENTIAL: Observe the safety and cleanliness recommendations (refer to the brochure: RECOMMENDATIONS - PRECAUTIONS).
1. Recommended tools
[1] hub immobilising tool 6310T.
[2] pliers for removing and refitting hose clips 9029T.
[3] lifting bench 5702-T.A.
[3] lifting table plus accessories [4a] and [4b]. (tool [4a] is not represented).
[4a] Engine mounting with reversible tool 5704-T.
[4b] engine supports 5704-T.
[5] Set of 2 clamps for 0 to 26 mm diameter hoses 4153-T.
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Slacken the front wheel bolts.
Chock and raise the vehicle on a 2 column lift.
Remove:
- The engine cover
- The battery style cover
Disconnect the battery.
Drain:
- The cooling system (see the relevant operation)
- The gearbox (manual gearbox)
Disconnect the connector of the flowmeter.
Remove:
- The ECU housing cover
- The air filter with the air flow sensor
Mark, uncouple and move aside the vacuum pipes (5).
Remove:
- The air duct (4)
- The coolant hoses (2) and (3) Using tool [2]
- The cooling radiator (1)
- The front wheels
- The front right and left hand splashshields
- The drive shafts; Using tool [1] (see the relevant operation)
Remove:
- The air duct (7)
- The lower torque reaction link (6)
Uncouple the hoses (9) and (10) of the heater matrix.
Remove:
- The exhaust flexible joint and catalytic converter assembly
- The 3 fixings of the gear controls support (11)
Unclip and move aside the gearbox control cables (8) with the support (11) (see the relevant operation).
Fit a hose clamp [5] on the power-steering return pipe (12).
Uncouple and plug the tube (12).
Fit a hose clamp [5].
Disconnect, blank off and move aside:
- The pipe (17)
- The tube (16)
- The pipe (14)
- The pipe (15)
Remove the expansion chamber (13).
Remove:
- The diesel injection ECU (22)
- The pre-heater unit
Disconnect:
- The engine harness from the BSI (23)
- The earth lead (24)
Fold back and clamp the engine harness on the engine.
Uncouple:
- The clutch slave cylinder (18)
- The hoses (19) and (20) (additional heating according to equipment)
- The vacuum pipes (21) and the electrovalve connectors
CAUTION: Mark the connectors and tubes on the electrovalves.
Disconnect the earth wire on the gearbox.
2.1. Vehicle with air conditioning
Disconnect the connector (25).
Remove:
- The accessories drive belt (see the relevant operation)
- The guide roller of the accessories drive belt
- The 2 mountings (26)
- The 2 mountings (28)
Hang the air conditioning compressor (27) on the vehicle body.
Protect the cooling condenser with cardboard.
2.2. Removing (continued)
Place the vehicle at a height of 50 cm from the ground.
Position the lifting table [3] with its pivoting platform, underneath the engine-gearbox assembly via the front of the vehicle.
Lift the elevating platform [3].
Clamp the engine-gearbox assembly using tools [4a] and [4b].
N.B.: Position the tools [4b] in the recessed holes in the cylinder block, Position the tool [4a] on the lower torque reaction rod.
Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.
Remove:
- The upper torque reaction link (31)
- The 3 bolts (32)
- The nut (29)
- The right-hand engine mounting (30)
Remove the 3 bolts (33).
Bring the engine-gearbox assembly as far forward as possible towards the front of the vehicle.
Remove the turbocharger air admission duct.
Slowly lower the lifting table [3].
CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell.
Manoevre the engine-gearbox assembly to facilitate removal.
Raise the vehicle.
Mark the location of the lifting table on the ground.
Remove the engine/gearbox assembly from underneath the vehicle.
3. Refitting
Raise the vehicle.
Position:
- The lifting table under the vehicle (to the marks made during removal)
- The vehicle has a height of 50 cm
Lift the elevating platform [3].
CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell. If necessary move the engine-gearbox assembly to facilitate its repositioning.
Refit the turbocharger air admission duct.
Reposition the engine-gearbox assembly opposite its upper fixings.
Refit:
- The 3 bolts (33), Tighten to 4,5 ± 0,5 daN.m
- Upper right-hand engine support (30)
- The 3 bolts (32), Tighten to 6,1 ± 0,5 daN.m
- The nut (29), Tighten to 4,5 ± 0,5 daN.m
- The upper torque reaction link (31)
Withdraw the lifting bench [3] from under the vehicle.
3.1. Vehicle with air conditioning
Refit:
- The 2 mountings (26)
- The 2 mountings (28)
- The guide roller of the accessories drive belt
- The accessories drive belt (see the relevant operation)
Reconnect the connector (25).
Remove the the protective card from the air conditioning condenser.
3.2. Refitting (continued)
Reconnect:
- The earth wire on the gearbox
- The vacuum pipes (21) and the electrovalve connectors (respect the marks made at the time of removal)
Reconnect:
- The additional heating hoses (19) and (20) (according to equipment)
- The clutch slave cylinder (18)
- The hoses (9) and (10) of the heater matrix
Unclamp, reposition and reconnect:
- The engine harness on the BSI (23)
- The earth lead (24)
Refit:
- The pre-heater unit
- The diesel injection ECU (22)
- The expansion bottle (13)
Reposition - Reconnect:
- The fuel delivery hose (14)
- The fuel return hose (15)
- The tube (16)
- The pipe (17)
- The tube (12)
Remove the tools [5].
Reposition and attach the gearbox control support (11).
Reclip the gearbox control cables (8) on the gearbox.
Refit the exhaust flexible joint and catalytic converter assembly.
Refit:
- The lower torque reaction link (6)
- The turbocharger outlet air duct (7)
- The drive shafts (see the relevant operation)
- The front right and left hand splashshields
- The front wheels
- The cooling radiator (1)
- The coolant hoses (2) and (3)
- The air duct (4)
- Position and connect the vacuum control tubes (5) on the various components (respect the marks made at the time of removal)
Refit:
- The air filter with the air flow sensor
- The ECU housing cover
Recouple the connector on the flow meter.
Reconnect the battery.
Top up the oil in the gearbox.
Fill and bleed the cooling system (see the relevant operation).
Check the hydraulic fluid level.
Refit:
- The engine cover
- The battery style cover
Lower the vehicle to the ground.
Check that the air-conditioning is working correctly.
Carry out:
- A road test
- A reading of the diagnostic memories
Parts & tools for this job For 2001 Citroën C5
- PARTEngine gasket setSearch: Citroën C5 2001 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.