Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Instruments and warning lamps23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën C5 Factory Workshop Manual (2001-2004)01 · Engine
01 · Engine

Removing - refitting: Power unit (EW10D)

Make
Citroën
Model
C5 Factory Workshop Manual
Year
2001–2004
Section
Engine assembly › Removing - refitting: Power unit (EW10D)
EngineRemoving - refitting: Power unit (EW10D)

Removing - refitting: Power unit (EW10D)

Citroën C5 · Removal-fitting · Ref. B1BG44P0

Applies to: 2.0 i

ESSENTIAL: Observe the safety and cleanliness recommendations   (refer to the brochure: RECOMMENDATIONS - PRECAUTIONS).

1. Recommended tools

Figure e5ap1t2c

[1] union for venting fuel pressure 4192-T.

Figure e5-p12cc

[2] hub immobilising tool 6310-T.

Figure e5ap1u2c

[3] lifting table plus accessories [4a] and [4b]   (tool [4a] is not represented).

Figure e5ap1gvc

[4a]   Engine mounting with reversible tool 5704-T.

[4b] engine support 5704-T.

Figure e5ap1u3c

[5] set of two hose clamps 4153-T.

Figure e5ap17wc

[6]   plugs kit (-).0188 T.

Additional tools:

  • Pliers for removing "CLIC" clips 4145-T
  • Pliers for removing and refitting hose clips 9029-T
  • Filling cylinder 4520-T
  • Filling cylinder adaptor 4222-T

2. Removing

ESSENTIAL: Respect the safety and cleanliness requirements that are specific to petrol direct injection (HPi) vehicles.

Place the vehicle on a 2-post lift.

Slacken the front wheel bolts.

Lift and support the vehicle.

Disconnect the battery negative terminal.

Remove:

  • The front wheels
  • The front splash shields

Release the drive shaft nuts.

Drain:

  • The engine cooling system   (see the relevant operation)
  • The gearbox   (manual gearbox)   (see the relevant operation)
Figure b1bp2bxd

Remove:

  • The battery
  • The battery support
  • The air filter box and sleeve (1)
  • The air intake manifold (2)   (see the relevant operation)

Mark, disconnect and move aside the vacuum control tubes.

Uncouple:

  • The hoses of the coolant outlet housing
  • The 2 gear control cables
  • The click-fit pipes of the heater assembly
Figure b1bp2byc

Place the tool [1] on the valve (3) to drop the pressure of the fuel supply circuit.

N.B.: Place a cloth to protect yourself against any projections of fuel.

Disconnect and blank the fuel delivery click-fit hose   (at "a")   Using the tools [6].

Remove:

  • The cooling radiator
  • The clutch slave cylinder

Disconnect the connectors of the following components:

  • Petrol injectors
  • Alternator
  • Starter
  • Knock sensor
  • Power steering pressure sensor
  • Coolant temperature sensor

Disengage the engine harness.

Remove the accessories drive belt   (see the relevant operation).

Disconnect the air con compressor.

Remove the air conditioning compressor and fix it to a bodywork component.

Protect the cooling condenser with cardboard.

Figure b3ep12hd

Fit a hose clamp [5] on the power-steering return pipe (4).

Uncouple and plug the tube (4).

Figure b3ep12jc

Fit a hose clamp [5].

Disconnect, blank off and move aside:

  • The pipe (5)
  • The tube (6)
Figure b1bp2bzc

Remove:

  • The drive shafts   (see the relevant operation)
  • The exhaust clip (7)
  • The reaction link (8)

Position the vehicle at a height of 50 cm.

Position the lifting table [3] with its pivoting platform, underneath the engine-gearbox assembly via the front of the vehicle.

Lift the elevating platform [3].

Clamp the engine-gearbox assembly using tools [4a] and [4b].

N.B.: Position the tools [4b] in the recessed holes in the cylinder block. Position the tool [4a] on the lower torque reaction rod.

Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.

Figure b1bp2c0c

Remove:

  • The upper torque reaction link (9)
  • The 3 bolts (10)
  • The (11) bolt
Figure b2cp3e1c

Remove the 3 bolts (12).

Figure b1bp2c1d

Bring the engine-gearbox assembly as far forward as possible towards the front of the vehicle.

Gently lower the engine-gearbox assembly with the lifting bench.

CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell.

Manoevre the engine-gearbox assembly to facilitate removal.

Raise the vehicle.

Mark the location of the lifting table on the ground.

Move the engine-gearbox assembly away from under the vehicle.

3. Refitting

Raise the vehicle.

Position:

  • The lifting table under the vehicle   (to the marks made during removal)
  • The vehicle has a height of 50 cm

Lift the elevating platform [3].

CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell. If necessary move the engine-gearbox assembly to facilitate its repositioning.

Reposition the engine-gearbox assembly opposite its upper fixings.

Refit:

  • The 3 bolts (12)   Tighten to 4,5 ± 0,5 daN.m
  • Upper right-hand engine support
  • The 3 bolts (10)   Tighten to 6,1 ± 0,6 daN.m
  • The upper torque reaction link (9)

Take away the lifting table [3].

Reposition the air conditioning compressor.

Refit the ancillary belt   (see the relevant operation).

Remove the the protective card from the air conditioning condenser.

Refit the radiator.

Couple up:

  • The click-fit pipes of the heater assembly
  • The hoses of the coolant outlet housing
  • The clutch slave cylinder

Reconnect the connectors of the following components:

  • Petrol injectors
  • Alternator
  • Starter
  • Knock sensor
  • Power steering pressure sensor
  • Coolant temperature sensor

Couple up:

  • The fuel delivery hose   (at "a")
  • The tube (4)
  • The tube (6)
  • The pipe (5)

Remove the tools [5].

Reposition and fix the gear control support.

Reclip the gearbox control cables on the gearbox.

Refit:

  • The reaction link (8)
  • The exhaust clip (7)
  • The drive shafts   (see the relevant operation)
  • The front splash shields
  • The front wheels
  • The air intake manifold (2)   (see the relevant operation)
  • The battery support
  • The battery
  • The air filter box and sleeve (1)

Reposition and recouple the vacuum tubes on the various components   (respect the marks made on removal).

Reconnect the battery negative terminal.

Fill and top up the gearbox oil   (manual gearbox)   (see the relevant operation).

Fill and bleed the cooling system   (see the relevant operation).

Check all the levels.

Refit:

  • The battery style cover
  • The engine covers

Return the vehicle to its wheels.

Tighten the wheel bolts.

Check that the air-conditioning is working correctly.

Carry out:

  • A road test
  • A reading of the diagnostic memories

Parts & tools for this job For 2001 Citroën C5

As an Amazon Associate we earn from qualifying purchases.