Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Instruments and warning lamps23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën C5 (X7) Factory Workshop Manual (2008-2017)01 · Engine
01 · Engine

Removing - Refitting: Engine - (DT17 - AM6) gearbox

Make
Citroën
Model
C5 (X7) Factory Workshop Manual
Year
2008–2017
Section
Engine assembly › Removing - Refitting: Engine - (DT17 - AM6) gearbox
EngineRemoving - Refitting: Engine - (DT17 - AM6) gearbox

Removing - Refitting: Engine - (DT17 - AM6) gearbox

Citroën C5 (X7) · Removal-fitting · Ref. B1BG011XP0

Applies to: Siemens injection and 2.7 HDi particle emission filter

ESSENTIAL: Observe the safety and cleanliness recommendations.

ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir. Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.

1. Recommended tools

Figure e5ap2y3d

[1] hub immobilising tool 6310-T.

Figure e5ap38fd

[2] pliers for removing and refitting hose clips 9029-T.

Figure e5ap32md

[3] lifting bench with removable plate 5702-T.A.

Figure e5ap3l4d

[4a] Engine mounting with reversible tool 5704-T.

[4b] engine support 5704-T.

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Chock and lift the vehicle on a 2 column lift.

ESSENTIAL: Fit safety straps.

Figure b1bp3esd

Remove:

  • The engine cover
  • The protective panel under the engine

CAUTION: Keep the luggage compartment lid open.

Disconnect the battery.

Drain the engine cooling circuit.

Detach and move aside:

  • The fuel supply pipe (1)
  • The fuel return pipe (2)
  • The expansion chamber pipes (8), (9) (10)

Disconnect the connectors   (at "a").

Remove:

  • The cover (4)
  • The air duct (3)
  • The air duct (6)
  • The air duct (7)
  • The air filter (5) with the air flow sensor
  • The air cleaner bracket ()
Figure b1bp3etd

Unplug:

  • The connectors   (at "b")
  • The connector   (at "c")
  • The electrical harness (15)

Detach and move aside:

  • The brake servo tube (11)
  • The hoses (16) and (17)

Disconnect, unclip and move aside:

  • The electrical harness (18)
  • The earth wire on the gearbox

Remove the engine ECU (12).

Move aside the engine compartment fusebox (13).

Remove ECU tray (14).

Remove:

  • The front bumper
  • The headlamps
  • The drive shafts; Using tool [1]
  • The engine cooling radiator; Using tool [2]
  • The turbocharging air cooler

Remove the front torque reaction rod.

Figure b1bm0x4d

Uncouple: The expansion bottle hose   (at "d").

Figure b1bm0x5d

Unplug:

  • The connector   (at "e")
  • The connector   (at "f")

Remove:

  • The stabiliser bar (23)
  • The accessories drive belt
  • The air conditioning compressor fixings (19)

Suspend the air conditioning compressor (19) on the vehicle body (Without opening the circuit).

CAUTION: Do not place the catalytic converter/particle emission filter assembly (25) hoses under stress.

CAUTION: Mark the fitting of the vacuum circuit pipes.

Remove:

  • The exhaust fasteners (24)
  • The catalytic converter /particle emission filter (25) assembly
  • The vacuum tank (21)

Release: The vacuum circuit pipe harness.

Remove:

  • The front subframe extensions (22), (26) and front subframe frame crossmember (20) assembly
  • The front pre-catalyser (Access to the rear reaction link rod)
  • The rear pre-catalyser (Access to the rear reaction link rod)
Figure b1bm0x6d

Unplug:

  • The connector   (at "g")
  • The connector   (at "h")
Figure b3gm00ad

Unplug: The hydraulic block (ABS) connector.

Move aside the harness.

Remove:

  • The hydraulic block (27) (ABS) and move it aside (Without opening the circuit)
  • The hydraulic block (ABS) support (28)
  • The gearbox control cable
Figure b1bm0x7d

Remove:

  • The nut (29) fixing the supply cable on the starter (30)
  • The (31) bolt
  • The bracket (32)

Release: The starter (30) supply cable.

Figure b1bm0x8d

Disconnect the pipes   (at "j" ,"k").

Figure b1bm0x9d

Unclamp: The power steering oil supply and return (33) pipes   (at "l", "m", "n").

Figure b1bm0xad

Unclamp: The power steering supply pipe   (at "p ", "q").

Figure b1bm0xbd

Remove:

  • The 3 bolts (34)
  • The pulley (35)
Figure b1bm0xcd

Remove: The fixing bolts (36) from the power steering pump (37).

Figure b1bm0xdd

Remove the nut (38).

Unclamp and move aside: The power steering pump   (from underneath the vehicle) (Without opening the circuit).

ESSENTIAL: When removing the rear reaction link rod, the engine base tilts towards the rear of the vehicle. There is contact between the gearbox absorber and the subframe.

Place a shim between the gearbox absorber and the subframe.

Uncouple the rear controlled rod.

Place the vehicle at a height of 50 cm from the ground.

Centralise the lifting table 3 under the engine/gearbox assembly.

Lift the elevating platform [3].

Figure b1bm0xed

Clamp the engine-gearbox assembly using tools [4a] and [4b].

N.B.: Place the tools [4b] on the edge of the oil sump. Place a tool [4a] on the rear fixing of the air conditioning compressor.

Figure b1bm0xfd

Place the engine support reversible tool [4a] in the right drive bearing.

Make spacers to fix the engine support reversible tool [4a]:

  • A spacer Ø 14 mm and length 40 mm at "s"
  • 2 Spacers Ø 8 mm and length 6 mm at "r" and "t"

Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.

Figure b1bm0xgd

Remove:

  • Vibration damping (39)
  • The nut (40)
  • The bolts (41)
  • The right-hand engine mounting (42)
Figure b1bm0xhd

Remove:

  • The left-hand flexible engine mounting (43) bolts
  • The bolts (44)
  • The harmonic vibration damper link (45) nut (46)
  • The (47) bolt
Figure b1bm0xjd

Support the engine cooling cassette (48) using a workshop hoist.

Remove the upper and lower fixings of the engine cooling cassette (48).

Tilt the engine cooling cassette ().

Move the engine-gearbox assembly forwards towards the front of the vehicle.

Slowly lower the engine and gearbox assembly   (using the lifting bench [3]).

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body, the air conditioning pipes and the power steering pipes.

Manoevre the engine-gearbox assembly to facilitate removal.

Remove the engine-gearbox assembly from the front of the vehicle.

Reposition the engine cooling cassette.

Refit the upper fixings of the cassette.

3. Refitting

CAUTION: At refitting, all the removed seals must be replaced with new seals.

Raise the vehicle.

Position the vehicle at a height of 50 cm.

Support the engine cooling cassette () using a workshop hoist.

Remove the upper fixings of the engine cooling cassette (48).

Tilt the engine cooling cassette (48).

Lift the elevating platform [3].

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly, the air conditioning pipes, the power steering pipes and the body. Manoevre the engine-gearbox assembly to facilitate its repositioning.

Position the engine-gearbox assembly facing its upper fixings.

Refit:

  • The left-hand engine mounting
  • The left-hand flexible engine mounting (43) bolts
  • The bolts (44)
  • The hydraulic block (ABS) support (28)
  • The harmonic vibration damper link (47) nut (46)
  • The (47) bolt
  • The right-hand engine mounting (42)
  • The bolts (41)
  • The nut (40)
  • The vibration damper (39)

Withdraw the lifting bench [3] from under the vehicle.

Reposition the engine cooling cassette on its upper fixings.

Refit:

  • The front subframe extensions (22) and (26) and front subframe frame crossmember (20) assembly
  • The rear reaction link rod

Connect the connectors   (at "g", "h").

Refit:

  • The front pre-catalyser
  • The rear pre-catalyser
  • The catalytic converter /particle emission filter (25) assembly
  • The exhaust fasteners (24)
  • The power steering pump (37)
  • The vacuum tank (21)
  • The vacuum circuit pipe harness

CAUTION: Adjust the reaction link rods.

Refit:

  • The front reaction link rod
  • The starter (30) supply cable
  • The gearbox control cable
  • The air conditioning compressor (19)
  • The auxiliary equipment drive belt
  • The stabiliser bar (23)
  • The earth wire on the gearbox
  • The expansion bottle hose   (at "d")
  • The hoses (16) and (17)
  • The turbocharging air cooler
  • The engine cooling radiator; Using tool [2]
  • The drive shafts; Using tool [1]
  • The engine compartment fuse box (13)
  • ECU tray (14)
  • The headlamps
  • The front bumper
  • The engine ecu (12)
  • The brake servo tube (11)

Join the hoses   (at "k", "j").

Refit:

  • The fuel supply pipe (1)
  • The fuel return pipe (2)
  • The expansion chamber pipes (8), (9)
  • The engine cooling radiator lower hose
  • The radiator top hose
  • The air filter (5) with the air flow sensor
  • The air duct (3)
  • The air duct (6)
  • The air duct (7)

Position and couple up:

  • The connectors   (at "b")
  • The connector   (at "c")
  • The harness (15)

Connect the connectors   (at "a").

Fill and bleed the cooling system.

Refit the cover (4).

Reconnect the battery.

Perform the following operations:

  • Check the brake fluid level
  • Check the LDS fluid level

Refit the engine style cover.

Check the operation of the air conditioning.

Carry out:

  • A road test
  • A reading of the diagnostic memories

Parts & tools for this job For 2008 Citroën C5

As an Amazon Associate we earn from qualifying purchases.