Removing - Refitting: Engine - DW12BTED4 (ML6C) gearbox
- Make
- Citroën
- Model
- C5 (X7) Factory Workshop Manual
- Year
- 2008–2017
- Section
- Engine assembly › Removing - Refitting: Engine - DW12BTED4 (ML6C) gearbox
Removing - Refitting: Engine - DW12BTED4 (ML6C) gearbox
ESSENTIAL: Observe the safety and cleanliness recommendations.
ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir. Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.
1. Tooling
[1] pliers for removing and refitting hose clips 9029-T.
[2] lifting bench (-).0004.
[3a] special support (-).0005-G; (-).0005-C.
[3b] special support (-).0005-G.
[4] Connecting rod support (-).0005-C.
[5] Dynamic roller tensioner compression lever (-).0188-Z.
[6] plugs kit (-).0188-T.
2. Removing
Place the vehicle on a two-post ramp.
Disconnect the battery.
Remove:
- The engine cover
- The front wheels
- The front splash shields
- The protective panel under the engine
Drain:
- The engine cooling system
- The gearbox
Remove: The ECU carrier cover (3).
Disconnect connector of the air flowmeter (as "a").
Remove:
- The air inlet neck (5)
- The air filter (4) with the air flow sensor
- The air union (2)
CAUTION: Plug the openings of the fuel circuit components; Using the tools [6].
Detach and move aside:
- The fuel pipes (7), (8)
- The degas pipes (1), (9)
Remove the accessories drive belt (6); Using tool [5].
Remove: The brake servo tube (10).
Disconnect, unclip and move aside:
- The engine electrical harness (11)
- The electrical harness (15)
- The positive supply (at "b")
- The connector (as "c")
Remove the engine management ECU (12).
Move aside the fusebox (14).
The ECU carrier (13).
Disconnect the heater hoses () and release them.
Disconnect and move aside:
- The connector (as "d")
- The connector (as "e")
CAUTION: Plug the opening of the clutch stop; Using tool [6].
Detach and move aside:
- The gearbox control rods (16)
- The earth cable (19) on the gearbox
- The clip (18)
- The clutch thrust bearing (17)
Remove:
- The engine cooling radiator
- The drive shafts
Move the reverse gear engagement device aside.
Unplug:
- The connector (as "f")
- The connector (as "g")
Remove the 3 air conditioning compressor (20) fixing bolts (21).
Move aside the air conditioning compressor (20) and hang it on the vehicle body.
Remove:
- The turbocharging air cooler inlet and outlet air ducts
- The dual turbocharger under engine air outlet duct ()
- The pre-catalytic converter exhaust clamp / Flexible pipe
- The lower torque reaction link
- High pressure fuel pump drive pulley setting pin
- The right transmission bearing
Place the lifting bench [2] under the engine-gearbox assembly.
Lift the elevating platform [2].
Fit:
- The tools [4] (as "h")
- The tool [3b] (as "j")
Fit the tool [3a] (as "k").
Lift the lifting bench [2] until the tools [3a], [3b], [4] grip.
Fix the tools [3a], [3b], [4] to the lifting table [2].
Raise the lifting table [2] slightly to place the engine-gearbox assembly under stress.
Remove:
- The bolts (23), (24)
- The upper torque reaction link (22)
- The bolts (25)
- The nut (27)
- Upper right-hand engine support (26)
Disconnect the connector of the ESP unit (as "l").
Slacken the bolts (29).
Unclip: The pipes from the ESP unit (as "m").
Release: The ESP unit (28).
Remove:
- The (34) bolt
- The nut (33)
- The stiffening plate (32)
Slacken the bolt (36).
Remove:
- The bolts (35)
- The ESP unit mounting (37)
- The bolts (31)
- The bolts (38)
- The left-hand upper engine mounting (30)
Slowly lower the engine and gearbox assembly; Using the lifting table [2].
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Manoevre the engine-gearbox assembly to facilitate removal; Using the lifting table [2].
Raise the vehicle.
Mark the location of the lifting table on the ground.
Move the engine-gearbox assembly away from under the vehicle.
3. Refitting
Raise the vehicle.
Position:
- The lifting bench [[2]] under the vehicle (to the marks made during removal)
- The vehicle at a height of 50 cm from the ground
Lift the elevating platform [2].
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body. Manoevre the engine-gearbox assembly to facilitate its repositioning.
Refit:
- The left-hand upper engine mounting (30)
- The bolts (31); Screw in without tightening
- The bolts (38); Screw in without tightening
- The ESP unit mounting (37)
- The bolts (35); Screw in without tightening
Tighten:
- The bolts (38), (31), (35)
- The screw (36) to 0,8 m.daN
Refit:
- The stiffening plate (32)
- The nut (33); Tighten to 6 daN.m
- The (34) bolt; Tighten to 6 daN.m
Reposition: The ESP unit (28).
Refasten: The pipes from the ESP unit (as "m").
Retighten the bolts (29) to 0,7 da.Nm.
Reconnect the connector of the ESP unit (as "l").
Refit:
- Upper right-hand engine support (26)
- The upper torque reaction link (22)
- The bolts (25); Screw in without tightening
- The bolts (23), (24); Screw in without tightening
- The nut (27)
Tighten:
Remove the fixing bolt from the tool [3a] on the lifting bench.
Lower the lifting bench [2] and the tools [3b], [4] and move them aside.
Remove the tool [3a] from the engine (as "k").
CAUTION: Replace the exhaust clamp.
Refit:
- The right transmission bearing; Tighten to the specified torque
- The right-hand driveshaft bearing heat shield; Tightening torque to 0,8 da.Nm
- The lower torque reaction link; Tighten to the specified torque
- The pre-catalytic converter exhaust clamp / Flexible pipe; Tighten to the specified torque
- The dual turbocharger under engine air outlet duct (); Tighten to the specified torque
- The turbocharging air cooler inlet and outlet air ducts
Reposition the air-conditioning compressor (20) on the engine.
Refit the 3 bolts (21) fixing the air-conditioning compressor (20); Tighten to the specified torque.
Reconnect:
- The connector (as "g")
- The connector (as "f")
Reposition the reverse gear engagement device; Tightening torque to 1 da.Nm.
Remove the tool [6].
Refit:
- The drive shafts
- The engine cooling radiator
- The clutch thrust bearing (17)
- The clip (18)
- The earth cable (19) on the gearbox
- The gearbox control rods (16)
Fill and drain the clutch hydraulic circuit.
Couple the heater matrix hoses ().
Reconnect:
- The connector (as "e")
- The connector (as "d")
Refit the ECU tray (13).
Reposition the fusebox (14).
Refit the engine management ECU (12).
Reconnect:
- The connector (as "c")
- The positive supply (as "b")
- The electrical harness (15)
- The engine electrical harness (11)
Refit:
- The brake servo tube (10)
- The accessories drive belt (6); Using tool [5]
Remove the tools [6].
Couple up:
- The degas pipes (1), (9)
- The fuel pipes (7), (8)
Refit:
- The air union (2)
- The air filter (4) with the air flow sensor
- The air inlet neck (5)
Reconnect connector of the air flow sensor (as "a").
Refit the cover on the ECU tray (3).
Fill the gearbox.
Fill and bleed the engine cooling circuit.
Refit:
- The protective panel under the engine
- The front splash shields
- The front wheels
- The engine cover
CAUTION: Perform the operations to be carried out following reconnection of the battery.
Reconnect the battery.
Return the vehicle to its wheels.
Parts & tools for this job For 2008 Citroën C5
- PARTEngine gasket setSearch: Citroën C5 2008 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.