Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Wiring harnesses23 Instruments and warning lamps24 Locking, alarm and airbags25 Electrical - driver assistance systems26 Heating, air conditioning and audio
Citroën C6 Factory Workshop Manual (2005-2012)01 · Engine
01 · Engine

Removing - refitting: turbocharger (front bank of cylinders)

Make
Citroën
Model
C6 Factory Workshop Manual
Year
2005–2012
Section
Exhaust › Removing - refitting: turbocharger (front bank of cylinders)
EngineRemoving - refitting: turbocharger (front bank of cylinders)

Removing - refitting: turbocharger (front bank of cylinders)

Citroën C6 · Removal-fitting · Ref. B1HGEWP0

Applies to: 2.7 HDi particle emission filter

ESSENTIAL: Observe the safety and cleanliness recommendations.

CAUTION: Before disconnecting the battery, partially open the door windows.

ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir. Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.

1. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

ESSENTIAL: Do not separate the pressure regulation valve from the turbocharger or slacken its fixings.

CAUTION: Keep the luggage compartment lid open.

Disconnect the battery.

Figure b1jp085d

Remove:

  • The engine cover
  • The sound-deadening under the engine
  • The fixing (1)
  • The stabiliser bar (2)
Figure c4ap1k1d

Remove:

  • The air filter (4) (complete)
  • The air ducts (3) and (5)
  • The mountings (6)

Move the cooling cassette (7) aside as far as possible.

Figure b1bp3e8d

Remove:

  • The air ducts (8), (9), (10) and (11)
  • The oil gauge fixing
Figure b1hp26lc

Remove:

  • The tube (12)
  • The clip (13)
  • The tube (14)
  • The mountings (17)

Move aside the gas recycling valve (18)   (see the relevant operation).

Remove:

  • The heat shields (16)
  • The front pre-catalyser (15)   (see the relevant operation)
  • The oil supply union screw (19) and its 2 seals
Figure b1hp26mc

Disconnect the connector "a".

Remove:

  • The oil return duct (23)
  • The fixing (24)
  • The mountings (21)
  • The exhaust gas manifold (20), the turbocharger (22)   (from underneath the vehicle)

On the bench, separate the exhaust manifold (20) from the turbocharger (22).

CAUTION: Close the lubrication ducts and the oil return ducts on the turbocharger and the engine.

2. Refitting

CAUTION: Check the absence of foreign bodies in the air ducts when refitting.

Figure b1hp26nc

CAUTION: Use new seals.

Fit the turbocharger (22) on the exhaust manifold (20).

Tighten the nuts (25) to 2,2 ± 0,3 daN.m.

Refit the exhaust manifold (20) and turbocharger (22) assembly.

Place a plastic centring pin at "b"   (available from Replacement Parts).

Tightening torques:

  • The fixings (21) to 2,5 ± 0,2 daNm
  • The fixing (24) to 3,2 ± 0,25 m.daN
  • The oil supply union screw (19) to 3 ± 0,3 m.daN

3. Refitting   (continued)

Continue the fitting operations in the reverse order to removal.

Parts & tools for this job For 2005 Citroën C6

As an Amazon Associate we earn from qualifying purchases.