Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Wiring harnesses23 Instruments and warning lamps24 Locking, alarm and airbags25 Electrical - driver assistance systems26 Heating, air conditioning and audio
Citroën C6 Factory Workshop Manual (2005-2012)01 · Engine
01 · Engine

Removing - refitting: turbocharger (rear bank of cylinders)

Make
Citroën
Model
C6 Factory Workshop Manual
Year
2005–2012
Section
Exhaust › Removing - refitting: turbocharger (rear bank of cylinders)
EngineRemoving - refitting: turbocharger (rear bank of cylinders)

Removing - refitting: turbocharger (rear bank of cylinders)

Citroën C6 · Removal-fitting · Ref. B1HGEYP0

Applies to: 2.7 HDi particle emission filter

ESSENTIAL: Observe the safety and cleanliness recommendations.

CAUTION: Before disconnecting the battery, partially open the door windows.

ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir. Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.

1. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

ESSENTIAL: Do not separate the pressure regulation valve from the turbocharger or slacken its fixings.

Figure b1jp087d

CAUTION: Keep the luggage compartment lid open.

Disconnect the battery.

Remove:

  • The engine cover
  • The sound-deadening under the engine
  • The stabiliser bar (1)
  • The particle emission filter   (see the relevant operation)
Figure b1hp26hc

Remove:

  • The tube (4)
  • The clip (8)
  • The tube (2)
  • The mountings (5)

Move aside the gas recycling valve (3)   (see the relevant operation).

Remove:

  • The turbocharger air inlet and outlet pipes
  • The heat shields (7)
  • The rear pre-catalyser (6)   (see the relevant operation)
Figure b1hp26jc

Disconnect the connector at " a ".

Remove:

  • The oil supply union screw (13) and its 2 seals
  • The oil return duct (11)
  • The fixing (12)
  • The mountings (10)
  • The exhaust gas manifold (9), the turbocharger (14)

On the bench, separate the exhaust manifold (9) from the turbocharger (14).

CAUTION: Close the lubrication ducts and the oil return ducts on the turbocharger and the engine.

2. Refitting

CAUTION: Check the absence of foreign bodies in the air ducts when refitting.

Figure b1hp26kc

CAUTION: Use new seals.

Fit the turbocharger (14) on the exhaust manifold (9).

Tighten the nuts (15) to 2,2 ± 0,3 daN.m.

Fit the exhaust manifold (9) and turbocharger (14) assembly.

Place a plastic centring pin at "b"   (available from Replacement Parts).

Tightening torques:

  • The fixings (10) to 2,5 ± 0,2 daNm
  • The fixing (12) to 3,2 ± 0,25 m.daN
  • The oil supply union screw (13) to 3 ± 0,3 m.daN

3. Refitting   (continued)

Continue the fitting operations in the reverse order to removal.

Parts & tools for this job For 2005 Citroën C6

As an Amazon Associate we earn from qualifying purchases.