Removing - Refitting: Exhaust gas recycling module
- Make
- Citroën
- Model
- C8 Factory Workshop Manual
- Year
- 2002–2014
- Section
- Emission control › Removing - Refitting: Exhaust gas recycling module
Removing - Refitting: Exhaust gas recycling module
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Precaution
CAUTION: Do not separate the exchanger (1) from the valve (2).
N.B.: The exhaust gas recycling module is assembled at the factory with the aid of a template. Assembling it without using a template would create positioning tensions on the cylinder head, adversely affecting the fixings and the sealings of the module.
2. Tooling
| tool | Reference | Designation |
|---|---|---|
| [0165-2] | Pliers for removing elastic clips |
3. Removing
Put the vehicle on a hoist.
Disconnect the battery.
Remove:
- The engine cover
- The handle
- The cooling fan control relay unit ()
CAUTION: Protect the engine cooling radiator to prevent damage to the fins.
Disconnect the connectors (as "a", "b").
Remove:
- The air filter housing (3) with the air flow sensor
- The air mixer unit (4)
Drain the cooling system.
Unclip the electrical harness sheath (5) and move it aside.
Remove:
- The mountings (6)
- The inlet air mixer unit support (7)
Remove:
- The dipstick (8)
- The (9) bolt
- The nut (10)
- The guide tube (11) for the oil dipstick (8)
Uncouple:
- The vacuum pipe (as "c")
- The pipe (12); Using tool [0165-2]
Remove:
- The bolts (17)
- The nut (13)
- The nut (14)
- The (15) bolt
- The pillar screw (16)
Remove:
- The stud (18)
- The stud (19)
Tilt the EGR module (22) downwards.
Remove:
- The bolts (20); Using a Torx spanner with extension
- The tube (21)
- The exhaust gas recycling module (22) (Carefully)
4. Refitting
4.1. Preparation
Clean the seal faces of the EGR module, using a special degreaser index "24".
CAUTION: When positioning the seal faces (24), (25), pay particular attention to the retaining studs (risk of leaks).
Refit: New seals (23), (24), (25).
Lubricate: Seal (23); With engine oil.
4.2. Subsequent operations
CAUTION: Adhere to the tightening torques.
Refit:
- The exhaust gas recycling module (22)
- The tube (21)
- The bolts (20)
- The stud (19)
- The stud (18)
Tightening procedure: EGR module (22).
Finger tighten: The mountings (13), (14), (15), (16), (17).
Tighten to the specified torque:
- The pillar screw (16)
- The (15) bolt
- The nut (14)
- The nut (13)
- The bolts (17)
Couple up:
- The pipe (12) from the cooling circuit; Using tool [0165-2]
- The vacuum pipe (as "c")
CAUTION: Lubricate the O-ring seals of the guide tube (11) for the oil dipstick (8); With engine oil.
Refit:
- The guide tube (11) for the oil dipstick (8)
- The (9) bolt
- The nut (10)
- The dipstick (8)
- The inlet air mixer unit support (7)
- The mountings (6)
Clip the electrical harness sheath (5).
Refit:
- The air mixer unit (4)
- The air filter housing (3) with the air flow sensor
CAUTION: Remove the protection from the cooling radiator.
Connect the connectors (as "a", "b").
Fill and bleed the cooling system.
CAUTION: Perform the operations to be carried out following reconnection of the battery.
Reconnect the battery.
Refit:
- The cooling fan control relay unit ()
- The handle
- The engine cover
Parts & tools for this job For 2002 Citroën C8
- TOOLOBD2 scannerSearch: OBD2 scanner
- TOOLDigital multimeterSearch: automotive digital multimeter
- TOOLBack-probe test leadsSearch: back probe test leads
As an Amazon Associate we earn from qualifying purchases.