Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Locking, alarm and airbags23 Heating, air conditioning and audio
Citroën C-Zero Factory Workshop Manual (2010-2020)01 · Engine
01 · Engine

Removing - Refitting: Boiler

Make
Citroën
Model
C-Zero Factory Workshop Manual
Year
2010–2020
Section
Cooling system › Removing - Refitting: Boiler
EngineRemoving - Refitting: Boiler

Removing - Refitting: Boiler

Citroën C-Zero · Removal-fitting · Ref. C5HG0189P0

Applies to: all versions

ESSENTIAL: Ensure that the precautions relating to safety and cleanliness are adhered to.

ESSENTIAL: Only those personnel who have received special training on electric vehicles are qualified to operate on the vehicle   (please observe the regulations that are in force in the country concerned).

ESSENTIAL: Switch off the voltage from the vehicle.

1. Preliminary operations

Remove the protector (Centre structure).

Figure b1bg22od

"A": Left-hand drive.

"B": Right-hand drive.

Remove the plug (1).

Lift and support the vehicle.

Figure c5hg0r8d

Remove the 2 bolts (2).

Disconnect the pipes ().

Drain the heating system.

Figure c5hg1hyd

Release the clips   (at "a" and "b").

Figure c5hg0red

Disconnect and unclip the connector   (at "c").

Unclip the clip ()   (at "d").

Figure c5hg1hzd

Remove the bolt (5).

Move aside the earth wire (4).

N.B.: From RPO 12929 the boiler is smaller and the front support is larger.

N.B.: For the following operations, 2 operators are necessary.

Remove:

  • The 4 bolts (3)
  • The boiler (6)

2. On the bench

2.1. Stripping

Figure c5hg0rkd

Remove:

  • The 2 bolts (7)
  • The bracket (8)
  • The 2 bolts (9)
  • The bracket (10)

2.2. Re-assembling

Refit:

  • The bracket (10)
  • The 2 bolts (9)
  • The bracket (8)
  • The 2 bolts (7)

3. Refitting

CAUTION: Adhere to the tightening torques.

N.B.: For the following operations, 2 operators are necessary.

Refit:

  • The boiler (6)
  • The 4 bolts (3)

Refit:

  • The earth lead (4)
  • The (5) bolt

Clip the clip   (at "d").

Clip and reconnect the connector   (at "c").

Fasten the clips   (at "a" and "b").

Couple up the pipes ().

Refit the 2 bolts (2).

4. Additional operations

Re-energise the vehicle.

Fill and bleed the heating system.

Fill the heating fluid reservoir to the level "FULL".

Switch on the ignition.

Move the ignition switch to obtain the display "READY".

CAUTION: Check that the heating fluid is circulating in the reservoir.

Switch on the heater.

Switch off the ignition.

Top up the heating fluid reservoir to the level "FULL" (If necessary).

Refit the plug (1).

Refit the cover () (Centre structure).

Parts & tools for this job For 2010 Citroën C-Zero

As an Amazon Associate we earn from qualifying purchases.