Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Locking, alarm and airbags23 Heating, air conditioning and audio
Citroën C-Zero Factory Workshop Manual (2010-2020)01 · Engine
01 · Engine

Removing - refitting: Cooling fan

Make
Citroën
Model
C-Zero Factory Workshop Manual
Year
2010–2020
Section
Cooling system › Removing - refitting: Cooling fan
EngineRemoving - refitting: Cooling fan

Removing - refitting: Cooling fan

Citroën C-Zero · Removal-fitting · Ref. B1GG01B7P0

Applies to: Electric motor 49KW 180N/M

ESSENTIAL: Observe the safety and cleanliness recommendations.

ESSENTIAL: Only those personnel who have received special training on electric vehicles are qualified to operate on the vehicle   (please observe the regulations that are in force in the country concerned).

1. Preliminary operations

CAUTION: Disconnect the 12 V ancillaries battery.

Drain the cooling system (Drive train).

Remove:

2. Removing

Figure b1gg0rfd

Remove:

  • The nut (1)
  • The cooling fan helix (2)
Figure b1gg0rid

Remove:

  • The bolts (3)
  • The electric motor (4)

3. Refitting

Refit:

  • The electric motor (4)
  • The bolts (3)
  • The cooling fan helix (2)
  • The nut (1)

4. Additional operations

Refit:

Fill and bleed the cooling system (Drive train).

CAUTION: Reconnect the 12 V ancillaries battery.

Parts & tools for this job For 2010 Citroën C-Zero

As an Amazon Associate we earn from qualifying purchases.