Removing - refitting: turbocharger (EP6CDT M/EP6CDT MD/EP6CDT)
- Make
- Citroën
- Model
- DS5 Factory Workshop Manual
- Year
- 2011–2015
- Section
- Turbocharging › Removing - refitting: turbocharger (EP6CDT M/EP6CDT MD/EP6CDT)
Removing - refitting: turbocharger (EP6CDT M/EP6CDT MD/EP6CDT)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Replacement of parts in all cases
| Designation | Quantity |
|---|---|
| Seal (Exhaust manifold) | 1 |
| Seal (Turbocharger lubrication inlet pipe) | 1 |
| Seal (Exhaust manifold / turbocharger) | 1 |
2. Removing
ESSENTIAL: Wait at least one hour before carrying out any work on the exhaust line.
Disconnect the ancillaries battery.
Place the vehicle on a two-post ramp.
Remove catalytic converter.
CAUTION: Fit blanking plugs in the openings of the turbocharger.
Remove the air conduit (2).
Disconnect the supply (3) from the turbocharger.
Remove the banjo bolts (5), (6), (7).
Release:
- The lubrication inlet pipe (1) of the turbocharger
- The cooling outlet pipe (4) of the turbocharger
Remove the fixing bolt (10) of the cooling inlet pipe (9) of the turbocharger.
Uncouple the turbocharging pressure regulation valve pipe (11).
Move aside the cooling inlet pipe (9) of the turbocharger.
Remove:
- The bolts (12), (13)
- The turbocharger mounting (14)
- The fixing bolt (8) of the lubrication return pipe (15) of the turbocharger
Disconnect the lubrication return pipe (15) from the turbocharger.
Remove:
- The 10 nuts (16)
- The contact shims (at "a")
- The turbocharger (17) and exhaust manifold (18) assembly
Remove:
- The fixing bolts (21) of the heat shield
- The lower heat shield (20)
- The exhaust manifold seal (19)
Remove:
- The banjo bolt (22)
- The lubrication inlet pipe (1) of the turbocharger (17)
Remove the securing nuts (23) from the exhaust manifold (18).
Split:
- The exhaust manifold (18)
- The turbocharger (17)
- Seal (24)
3. Refitting
CAUTION: Adhere to the tightening torques.
CAUTION: On refitting, all removed seals must be replaced with new seals.
Assemble:
- The exhaust manifold (18)
- Seal (24) (new)
- The turbocharger (17)
- The nuts (23)
Position the lubrication inlet pipe (1) of the turbocharger (17) (With a new seal).
Refit the banjo bolt (22) (without tightening).
Position a 9 mm diameter rod (at "b") (To torque tighten the socket screw (22)).
Refit:
- The (new) gasket (19) for the exhaust manifold (18)
- The lower heat shield (20)
- The fixing bolts (21) of the heat shield
- The turbocharger (17) and exhaust manifold (18) assembly
- The contact shims (at "a")
- The 10 nuts (16)
Couple the turbocharger (17) lubrication return pipe (15).
Refit:
- The fixing bolt (8) of the lubrication return pipe (15) of the turbocharger (17)
- The turbocharger mounting (14)
- The bolts (12), (13)
Put the turbocharger (17) cooling inlet pipe (9) in place.
Couple the turbocharging pressure regulation valve pipe (11).
Refit but do not tighten fixing bolt (10) of the cooling inlet pipes (9) of the turbocharger (17).
Put the turbocharger (17) cooling outlet pipe (4) in place.
Position the lubrication inlet pipe (1) of the turbocharger (17).
Refit the banjo bolts (6), (5), (7).
Position a 12 mm diameter rod (at "c") (To torque tighten the socket screw (7)).
Tighten the bolt (10).
Reconnect supply (3) to the turbocharger (17).
Refit the air duct (2).
Refit the catalytic converter.
Refit the catalytic converter.
CAUTION: Perform the operations that are required following a reconnection of the ancillaries battery.
Reconnect the ancillaries battery.
Parts & tools for this job For 2011 Citroën DS5
- PARTEngine gasket setSearch: Citroën DS5 2011 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.