Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Electrical - general19 Starting and charging20 Locking, alarm and airbags21 Electrical - driver assistance systems22 Heating, air conditioning and audio
Citroën Jumper Factory Workshop Manual (1994-2002)02 · Gearbox and clutch
02 · Transmission

Re-assembling: Gearbox control plate

Make
Citroën
Model
Jumper Factory Workshop Manual
Year
1994–2002
Section
Gearbox › Re-assembling: Gearbox control plate
Gearbox and clutchRe-assembling: Gearbox control plate

Re-assembling: Gearbox control plate

Citroën Jumper · Stripping/refitting · Ref. B2CS0EP0

Applies to: BVM MG5T and BVM5 4X2 and 2.5 d (DJ5) or BVM MG5T and BVM5 4X2 and 2,5 l td (DJ5TED) or BVM MG5T and BVM5 4X2 and 1.9 or BVM MG5T and BVM5 4X2 and 2.5 d (DJ5T)

1. Preliminary operations

Stripping: gearbox.

Removing: Ratio 5th.

Removing: gearbox casing.

Stripping: Gearbox control plate.

2. Re-assembling

Figure b2cp102c

Refit a new needle bearing cage (1) (selection control shaft).

By means of tool [4] and a press (bear against a horizontal surface).

Figure b2cp103c

Refit a new needle bearing cage (2) (1st/2nd fork shaft).

By means of tool [4] and a press.

Figure b2cp104c

Refit:

  • The spring (4)
  • Locking pintle (3)
  • The gear locking ball assembly (a)
  • The circlip (b)
Figure b2cp105c

Refit:

  • Reverse gear relay lever (5)
  • The shaft (6)
Figure b2cp106c

Refit:

  • Flexible roll pins (7) (do not push them home)
  • The shaft (8) (gear engagement)
  • Gear engagement lever (10)
  • A new roll pin (9) Using tool [3]

N.B.: Use tool [3] With tools [C2]; [C3].

Figure b2cp107c

Replace the clutch fork pin 11 (1st/2nd gears).

Figure b2cp108c

Refit simultaneously:

  • Fork shaft (3rd/4th speeds)
  • Fork shaft (5th gear)
Figure b2cp109c

Assemble:

  • Interlock mechanism (15)
  • Gear engagement sprocket
Figure b2cp10ac

Align the notches "B" of the fork shafts.

Refit assembly (14,15) to the gear change control mounting plate.

Figure b2cp10bc

Refit:

  • The spacer (16)
  • The spring (17)
  • The selection shaft (18)
Figure b2cp10cc

Position shaft (18) (mark "A" must be visible).

Fit a new tension pin (19) Using tool [23].

Figure b2cp10dc

Make sure that all the gears engage correctly Actuate shaft (20) by hand.

Figure b2cp10ec

Fit seal (21).

3. Additional operations

Refitting: gearbox casing.

Refitting: Ratio 5th.

Re-assembling: gearbox.

Parts & tools for this job For 1994 Citroën Jumper

As an Amazon Associate we earn from qualifying purchases.