Stripping: Gearbox control plate
- Make
- Citroën
- Model
- Jumper Factory Workshop Manual
- Year
- 1994–2002
- Section
- Gearbox › Stripping: Gearbox control plate
Stripping: Gearbox control plate
1. Preliminary operations
Stripping: gearbox.
Removing: Ratio 5th.
Removing: gearbox casing.
2. Presentation
3. Stripping
Remove the tension pin (1) Using tool [23].
N.B.: The position of the shaft is given by mark "A".
Remove:
- The selection shaft (2)
- The spacer (3)
- The spring (4)
Remove the interlocking key (5).
Remove gear engagement sprocket (6).
Remove together:
- Fork shaft (3rd/4th speeds)
- Fork shaft (5th gear)
Remove:
- Fork shaft (1st/2nd gears)
- The shaft (10)
- Reverse gear relay lever (9)
Retrieve:
- Locking pintle (12)
- The spring (13)
Remove:
- The pin (15) Using tool [3]
- The shaft (14)
CAUTION: Equip tool [3] with tool [C2] at the beginning of the operation and then with tool [C4] at the end.
Remove:
- The circlip (16)
- The gear locking ball assembly
Remove needle bearing cage (17) (1st/2nd fork shaft) By means of tool [4] and a press.
Remove the centralising dowels (19).
Remove needle bearing cage (18) (selection control shaft) By means of tool [22] and a press (bear against a horizontal surface so that the cage can be disengaged).
4. Additional operations
Re-assembling: Gearbox control plate.
Refitting: gearbox casing.
Refitting: Ratio 5th.
Re-assembling: gearbox.
Parts & tools for this job For 1994 Citroën Jumper
- PARTClutch kitSearch: Citroën Jumper 1994 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Citroën Jumper manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.