Removing - refitting: Power unit
- Make
- Citroën
- Model
- XM II Factory Workshop Manual
- Year
- 1994–2000
- Section
- Engine assembly › Removing - refitting: Power unit
Removing - refitting: Power unit
1. Recommended tools
[1] pliers to remove "clic" clips 4145-T.
[2] pliers for removing and refitting hose clips 9029-T.
[3] LHM reservoir/filter assembly cover 9004-T.
[4] ball-joint extractor 9040-T.G2.
[5] ball-joint extractor 9040-T.G1.
[6] slave cylinder locking end-piece 9040-T.F.
[7] lifting bracket 2517-T.bis.
[8] engine supports 5704-T.
[9] lifting bench 5702-T.A.
2. Preliminary operations
Disconnect the battery negative terminal.
Release the pressure in the hydraulic circuit (see the relevant operation).
Drain:
- The cooling system (see the relevant operation)
- The gearbox (manual gearbox)
Remove:
- The drive shafts (see the relevant operation)
- The auxiliary equipment drive belt (see the relevant operation)
- The front splash shields
3. Removing
N.B.: Plug the orifices when uncoupling a pipe.
Disconnect the pipes (1).
Remove the pipes fixing (1) on the cradle.
CAUTION: Do not open the cooling system.
Remove the fixings of the air conditioning compressor (suspend the air conditioner compressor from the bodyshell of the vehicle).
Uncouple:
- The exhaust ball-joint
- The lower torque reaction link
Remove:
- The battery (2)
- The air filter (3) box
- The ECU housing cover (4)
- The throttle butterfly housing (5)
Uncouple:
- Accelerator cable
- The pipe (6)
Remove:
- The style cover (7)
- The sensor (8) (pressure sensor integrated)
Release the pressure in the injector fuel rail (see the relevant operation).
Uncouple the click-fit unions of the fuel supply and return pipes (9).
Disconnect the throttle air thermistor (10).
Uncouple the pipe (11) Using tool [1].
Remove the induction air pipe (12).
Uncouple the bonnet opening cable (from the upper front crossmember).
Release the bonnet opening cable (13) from the battery tray.
Remove the 2 bolts (14).
Release the drier (15).
Remove:
- The screws at "a"
- The battery tray (16)
N.B.: Mark the routing and fixing points of the harnesses fixed to the battery tray (16).
Unplug:
- The ECUs (17)
- The unit (18)
- The relay (19)
- The cruise control electronic control unit (20)
- The inertia switch (21)
- The purge canister solenoid valve (22)
Disconnect the pipes (23) Using tool [2].
Disconnect the connectors (24).
Unplug:
- The wires (25)
- The connector (26)
Release the junction box from its protective cover (27).
Unplug:
- Connectors (28) and (29)
- The connector at "b"
Disconnect the connector (30) (oxygen sensor).
3.1. Automatic gearbox
Uncouple the selector cable (31) Using tool [4].
Unclip the gear selection sheath from its mounting.
CAUTION: Do not twist the rod of the gear selection cable when uncoupling.
3.2. Manual gearbox
Uncouple the control rods for gears shift selection Using tool [5].
Remove the retaining clips of the gear selector cables.
Disconnect the clutch slave cylinder from the gearbox (by rotation).
Fit the tool [6] to the clutch slave cylinder.
CAUTION: Do not drop the clutch push rod into the bell housing.
3.3. Removing: (continued)
Uncouple the return pipe (32).
Remove:
- The LHM tank fluid pick-up unit
- The LHM reservoir
Fit the tool [3].
Remove the clips (33).
Disconnect the pipes (34).
Remove the front panel (see the relevant operation).
Uncouple the 2 hoses from the radiator.
Remove the radiator.
Support the power unit Using tool [7].
Disconnect the connector (35).
Disconnect the earth (37).
Remove protection plate (36).
Remove the nut (38).
Slightly lower the engine.
Remove:
- The mountings (39)
- Gearbox support (40)
Remove:
- The screws (41) and (42)
- The reaction link (43)
- The nut (44)
CAUTION: Take care not to damage the bulkhead.
N.B.: Carefully release the air conditioning condenser from the body.
Remove the power train.
N.B.: This operation is carried out from above.
Remove the exhaust clamp (45).
Loosen the clips (46).
Remove:
- The nuts (47)
- The exhaust pipes (48)
Position retaining shafts (8).
Place the engine/gearbox assembly on the hydraulic table [9].
4. Refitting
ESSENTIAL: Always fit new Nylstop nuts.
Refit (on the workshop crane):
- The exhaust pipes (48)
- The nuts (47)
- The clips (45), (46) Tighten to 2,5 daN.m
- The gearbox mounting spacer Coat with G7 grease: 3 grammes
Position the power unit near its fixing points by fitting the lower torque reaction rod.
Place a jack below the gearbox (use a block of wood).
Using the jack, locate the stud of the gearbox in its support.
Refit:
- Gearbox support (40)
- The bolts (39) Tighten to 2,7 daN.m
- The nut (38) Tighten to 6,5 daN.m
Lower the power unit to the right level and refit the right engine support.
Refit:
- The nut (44) Tighten to 4,5 daN.m
- The reaction link (43)
- The (41) bolt Tighten to 5 daN.m
- The (42) bolt Tighten to 5 daN.m
Connect the return pipe (32).
Fit the air conditioning condenser.
N.B.: To facilitate locking the connector (35), align the two markings "c".
Reconnect the connector (35) (lock by turning).
Refit:
- The protector (36)
- The earth (37)
Couple the heater matrix hoses (34) (O ring seal).
Refit:
- The clips (33)
- The gear selector sheath retaining clip
4.1. Manual gearbox
Remove the tool [6].
Refit the clutch slave cylinder.
Couple up the control rods for gears shift selection.
Refit the gear selector cable retaining clips.
4.2. Automatic gearbox
Engage the gear lever in the parking position (in the passenger compartment).
Put the gear selector lever on the gearbox into the park position (lever towards the bulkhead).
Couple the selector cable (31) to the gearbox.
4.3. Refitting: (continued)
Remove the tool [3].
Refit:
- The LHM tank fluid pick-up unit
- Header tank (LHM)
Connect the HP pump supply hose to the pick-up unit Using tool [1].
Reconnect the connector (30).
Fasten the connector harness (30) to the bulkhead (using plastic collars).
Connect:
- Connectors (28) and (29)
- The connector at "b"
Refit:
- The wires (25)
- The protector (27)
- The junction box on the battery mounting
Connect:
- The connector (26)
- The connectors (24) (lock by turning)
- The purge canister solenoid valve (22)
- The inertia switch (21)
- The cruise control electronic control unit (20)
- The relay (19)
- The unit (18)
- The ECUs (17)
Join the hoses (23) Using tool [2].
Refit:
- The ECU housing cover (4)
- The battery tray (16)
Fasten the wiring harness to the battery tray using the markings made on removal (using plastic collars).
Refit:
- The screws at "a"
- The dehydrator (15)
Refit the pipes fixing (1) on the cradle.
Couple the tubes (1).
Refit the front panel (see the relevant operation).
Couple up:
- The bonnet opening cable (13)
- The tube (11) Using tool [1]
- The air hose (12)
- The fuel supply and return piping (9)
- The pipe (6)
- Accelerator cable
- The casing (5)
Position the styling cover (7).
Connect:
- The sensor (8) (pressure sensor integrated)
- Inlet air temperature sensor (10)
Check the sealing of the cooling system.
Refit:
- The air filter (3) box
- The air conditioning compressor
Refit the exhaust ball-joint Tighten to 1 daN.m.
Refit:
- The auxiliary equipment drive belt (see the relevant operation)
- The drive shafts (see the relevant operation)
- The front splash shields
Reconnect the battery negative terminal.
Fill the cooling system (see the relevant operation).
Checking the levels.
ESSENTIAL: Start the engine, with the pressure regulator release screw loosened.
Bleed the cooling system (see the relevant operation).
Parts & tools for this job For 1994 Citroën XM
- PARTEngine gasket setSearch: Citroën XM 1994 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.