Removing - refitting: Power unit (DW8)
- Make
- Citroën
- Model
- Xsara Factory Workshop Manual
- Year
- 1997–2000
- Section
- Engine assembly › Removing - refitting: Power unit (DW8)
Removing - refitting: Power unit (DW8)
1. Recommended tools
[1] hub immobilising tool 6310-T.
[2] pliers for removing plastic pegs 7504-T.
[3] setting rod for dynamic roller 7019-T.
[4] set of two hose clamps 4153-T.
[5] 16 FACOM angled ring spanner.
[6] pliers to remove "clic" clips 4145-T.
[7] pliers for removing and refitting hose clips 9029-T.
[8] lifting bracket 2517-T.Bis.
[9] tool for heater matrix "O" ring seal 9506-TB.
[10] filling cylinder 4520-T.
[11] bonnet stay 9601-T.
2. Removing
Disconnect the battery.
Lift and support the vehicle with front wheels suspended.
Remove:
- The front wheels
- The front right mud guard; Using tool [2] (vehicles with air conditioning)
Drain:
- The cooling system
- The gearbox
Remove the clips at "a", By means of a screwdriver.
Disengage the bonnet struts.
Refit the clips at "a".
Raise the bonnet in a vertical position, Using tool [11].
N.B.: Protect the radiator.
Remove the style cover.
Disconnect:
- The positive feeds (1) of the battery terminal
- The battery positive cable (2)
- The connector (5)
- ABS fitted vehicle: The ABS ECU connector
- Vehicle with air conditioning: The coolant temperature housing connector (8)
Uncouple:
- The vacuum pipe of the braking servo
- Accelerator cable
Unclip the support of the mini relays in the housing (6).
Remove:
- The air duct (3)
- The air cleaner (4)
- The air outlet duct
- The battery
- The battery tray
- The battery carrier (mark its location on removal)
- The bracket (7) (leave the pre-heater unit and the multifunction relay connected to the engine harness)
Attach the engine harness to the engine.
Remove the clip.
Unclip the heater click-fit hoses at "b" and disconnect at "c" and then unclip them from their 2 mountings on the bulkhead.
Unclip and release the fuel supply and return pipes.
N.B.: Plug the openings.
Uncouple:
- All the gear controls (10) on the gearbox
- The clutch cable (11) from the fork (13)
Move aside the clip (12).
Move aside the clutch cable (11).
Remove the earth wire (14).
Remove:
- The anti-recycling partition (see the relevant operation)
- The header tank fixing bracket
Unclip and disconnect the hoses from the header tank, At "d" and "f".
Disconnect the connection hose from the header tank, as "e" Using tool [7].
Remove header tank (15).
Disconnect from the oil/water heat exchanger, the hose to the engine coolant radiator.
2.1. Vehicle with air conditioning
Remove the accessories drive belt.
Put the dynamic roller tensioner in the broken belt position.
Disconnect the electrical supply (16) from the air conditioning compressor (18).
Remove Using tool [5]:
- The mountings (19)
- The mountings (17)
N.B.: Tilt the air conditioning compressor towards the outside of the engine to gain access to the upper fixings.
Hang the air conditioning compressor (18) from the vehicle body.
2.2. Removing (continued)
Remove the drive shafts (see the relevant operation).
Place the tool [4] on the suction pipe of the power assistance pump.
Remove the 3 fastenings of the connector pipe which joins the assistance pump and the rotary valve.
Disconnect pipes (20) and (21); blank them off.
Disconnect and release the engine coolant inlet hose, Using tool [7].
Uncouple the exhaust ball-joint.
Remove:
- Remove the 2 bolts (22)
- The reaction link (23)
Install a workshop crane.
Place the engine in a sling, Using tool [8].
Attach the hooks to the sling to obtain an angle of 45° when removing the power unit.
Put the lifting equipment and the bracket under tension.
Place a jack below the gearbox.
Remove:
- The bolts (27)
- The cross beam (26)
- The nuts (24) and (25)
Remove:
- The nut (31)
- The nuts (32)
- The silentblock (29)
- The bolts (30)
- The gearbox mounting (33)
Lower the jack slowly.
Slowly lift up the power unit.
3. Refitting
Position the power unit in its location.
Place a jack below the gearbox.
Refit the right-hand engine mounting (28).
Refit the nut (24) (without tightening).
Raise the gearbox using the jack.
Refit the gearbox bracket (33).
Tighten the bolts (30) to 2,2 m.daN.
Refit:
- The silentblock (29)
- The nuts (32), Tighten to 2,2 daN.m
- The nut (31), Tighten to 6,5 daN.m
- The nut (24), Tighten to 4,5 daN.m
- The nut (25), Tighten to 2,2 daN.m
- The reaction link (23)
- The 2 bolts (22), Tighten to 5 daN.m
Continue the fitting operations in the reverse order to removal.
3.1. Refit the automatically adjusted clutch cable
Couple the clutch cable to the fork (13).
Press the clutch pedal several times to fully locate the cable.
Ensure that the outer clutch cable is correctly located in the bulkhead.
Check the operation of the automatic take-up system:
- Pull the lever in the opposite direction to when declutching
- Press the clutch pedal very lightly and repeat the same manoeuvre: The lever shouldn’t move backwards
3.2. Refitting
Fill and top up the level of the following of the following elements:
- The gearbox
- The cooling system, Using tool [10]
Turn the steering slowly from lock to lock in each direction.
Check the steering fluid level.
Return the vehicle to its wheels.
3.3. With air conditioning
Check that the air-conditioning is working correctly.
3.4. Anti-lock braking system
Switch on the ignition.
When the warning lamp goes out at the end of 3 seconds, it signals normal operation.
Road test.
Perform a reading of the autodiagnostic memory.
Parts & tools for this job For 1997 Citroën Xsara
- PARTEngine gasket setSearch: Citroën Xsara 1997 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.