Removing - refitting: Power unit (EW10J4)
- Make
- Citroën
- Model
- Xsara II Factory Workshop Manual
- Year
- 2000–2006
- Section
- Engine assembly › Removing - refitting: Power unit (EW10J4)
Removing - refitting: Power unit (EW10J4)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
[1] lifting bench 5702-T.A.
[2] engine supports 5704-T.
[1] Lifting table 5702-T.A with the accessories [2] 5704-T.
[3] Extractor for ball-joint 9040-TG1 and 9040-TG2 (kit 9040-TG).
2. Additional tools
pliers for removing and refitting hose clips 9029-T.
Pliers for removing "CLIC" clips 4145-T.
Hose clamp 4153-T.
filling cylinder 4520-T.
Filling cylinder adaptor 4222-T.
Pliers for removing plastic pegs 7504-T.
Socket 35 mm A/F.
Petrol pressure venting union 4192-T.
hub immobilising tool 6310-T.
3. Removing
Disconnect the battery positive and negative terminals.
Raise and support the vehicle on a 2 -post lift.
Remove the front wheels.
Release the drive shaft nuts.
Drain:
- The gearbox
- The engine cooling system (see the relevant operation)
Tighten the clamp of the air duct (1) at aperture "a".
Unplug:
- The injection ECU
- The petrol injectors
- The inlet manifold connectors
- The 2 oxygen sensors
- The power steering pressure sensor
- The air pump
- The EGR valve
- The ignition module
- The canister electrovalve
Remove:
- The air cleaner and its bracket
- The battery and its bracket
- The injection ECU
- The inlet manifold
- The cooling radiator with the bottom and top hoses
- The exhaust manifold (see the relevant operation)
- The air recycling pipe
Disconnect the starter motor and alternator electrical supplies.
Move aside the electrical harness (towards the front left hand wheelarch).
ESSENTIAL: Plug the exhaust and inlet apertures.
Uncouple:
- Accelerator cable
- The braking assistance pipe
- The clutch cable
- The gearbox control rods Using tool [3]
- The click-fit pipes of the heater assembly
ESSENTIAL: Drop the pressure in the fuel supply circuit Using tool 4192-T.
Disconnect and blank the fuel delivery click-fit hose.
Disconnect the knock sensor.
Disconnect the reverse gear switch.
Clamp the power steering return pipe.
Disconnect and blank the power steering supply pipe.
Remove the power steering tube fixing lugs.
Vehicle with air conditioning:
- Remove the accessory drive belts (see the relevant operation)
- Disconnect the air con compressor (3)
- Remove the air conditioning compressor and fix it to a bodywork component
Remove:
- The drive shafts (see the relevant operation)
- The reaction link (2)
Remove the hose retaining lug screws (4) (at "b").
Uncouple the hose (4) from the power steering pump Plug its aperture.
Position the vehicle at a height of 60 cm (between the ground and the front towing hitch).
Insert the lifting table 1 under the right side of the vehicle.
Centralise the lifting table 1 under the engine/gearbox assembly.
Lift the elevating platform [1].
Bring the rear engine mounting and the gearbox into contact with the lifting bench [1].
Support the engine-gearbox assembly using the tools [2].
Remove:
- The 3 screws of the upper right hand engine mounting
- The nut of the upper left hand engine mounting
Slowly lower the engine-gearbox assembly (using the lifting bench [1]).
N.B.: Pivot the power unit so as to ensure there is no contact between it and the bodyshell.
Raise the vehicle.
At "c", mark the location of the lifting bench on the floor.
4. Refitting
N.B.: Always fit new Nylstop nuts.
Raise the vehicle.
Position the lifting bench [1] at the reference points "c".
Position the vehicle at a height of 60 cm (between the ground and the front towing hitch).
Lift the elevating platform [1].
N.B.: Pivot the power unit so as to ensure there is no contact between it and the bodyshell.
Refit:
- The nut of the upper left hand engine mounting Tightening torque: 6,5 ± 0,6
- The 3 screws of the upper right hand engine mounting Tightening torque: 6,1 ± 0,6
Lower lifting table [1].
Raise the vehicle.
Take away the lifting table [1].
Refit the drive shafts (see the relevant operation).
Vehicle with air conditioning:
- Relocate the air conditioning compressor (see the relevant operation)
- Connect the air conditioning compressor (3)
- Refit the ancillary belt (see the relevant operation)
Recouple the hose (4) to the power steering pump.
Refit the hose fixing lugs (4) (at "b").
Connect:
- The canister electrovalve
- The 2 oxygen sensors
- The earth cable (body fixing)
- The starter motor and alternator electrical supply
Couple up:
- The click-fit pipes of the heater assembly
- The gearbox control rods (see the relevant operation)
- The clutch cable
- The braking assistance pipe
- The air recycling pipe
Refit:
- The air intake manifold
- The exhaust manifold (see the relevant operation)
- The duct (1) with the air filter assembly
- The battery and its support with the injection ECU
Tighten the clamp of the hose (1) at aperture "a".
Connect the accelerator cable.
Fill and top up the level of the following of the following elements:
- Gearbox
- Engine cooling system
- Power steering pump
Bleed and top-up the cooling circuit to level (see the relevant operation).
Reconnect the battery positive and negative terminals.
Re-initialise the injection ECU.
Check that the air-conditioning is working correctly.
Lower the vehicle to the ground.
Parts & tools for this job For 2000 Citroën Xsara
- PARTEngine gasket setSearch: Citroën Xsara 2000 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.