Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Instruments and warning lamps23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën Xsara II Factory Workshop Manual (2000-2006)01 · Engine
01 · Engine

Removing - refitting: Power unit (TU5JP4)

Make
Citroën
Model
Xsara II Factory Workshop Manual
Year
2000–2006
Section
Engine assembly › Removing - refitting: Power unit (TU5JP4)
EngineRemoving - refitting: Power unit (TU5JP4)

Removing - refitting: Power unit (TU5JP4)

Citroën Xsara II · Removal-fitting · Ref. B1BG4QP0

Applies to: 1.6 i 16v 110 (TU5JP4)

1. Recommended tools

Figure e5-p01sc

[1] hub immobilising tool 6310-T.

Figure e5-p129c

[2] pivot ball-joint uncoupling lever 9509-T.

Figure e5ap1urc

[3] pliers for removing and refitting hose clips 9029-T.

Figure e5-p074c

[4] lifting bracket 2517-T.bis.

Figure e5-p105c

[5] ball-joint extractor 9040-TG1/TG2.

2. Removing

Disconnect the battery.

Lift and support the vehicle with front wheels suspended.

Remove the front wheels.

Remove the drive shafts (see the relevant operation).

Drain the cooling system (see the relevant operation).

Figure b1bp2gtc

Remove:

  • The cable of the accelerator pedal position sensor
  • The battery (4)
  • The battery support (5)
  • The ECU (3)
  • The air filter (6) box
  • The air inlet neck (2)
  • Disconnect the butterfly housing connector(1)
  • The heat exchanger flexible hoses
  • Disconnect the oxygen sensor connector (blue connector)
  • Disconnect the inertia switch
Figure b2cp3fpc

Remove the earth socket (7).

Figure b1gp09cc

Uncouple:

  • The radiator coolant inlet hose (8)
  • The radiator coolant outlet hose (9)
Figure b1gp09dc

Disconnect the double relay (10).

Figure b1bp2guc

Disconnect the canister purge electrovalve and bring back the connector (11) (engine compartment side).

Remove, from the RH engine mounting, the bridge supporting the cables and hoses.

Figure b1bp2gvc

Disconnect the 2 connectors (12).

Readjust the harness to the power unit.

Drop the pressure in the injector supply rail by using the Schraeder valve.

Figure b1bp2gwc

Uncouple:

  • The fuel supply clickfit union (15)
  • The click-fit pipes of the heater assembly (14) (type OPHELIE)
  • The vacuum take-off click-fit connection (13) for brake servo

Disconnect the power steering pressure sensor.

Remove the power steering supply tube fixing flange screw.

Remove the heat shield.

Position a hose clamp.

Uncouple the pipe Using tool [3].

Blank off the pipes.

Figure b2cp3fqc

Uncouple:

  • The ball joint (18) Using tool [5]
  • The outer cable stop (17)

Unplug:

  • The connector (16)
  • The black 2 -way connector
  • The rev counter connector
Figure b1bp2gxc

Remove:

  • The (19) bolt
  • The 2 fixing nuts of the heat shield
  • The 4 fixing nuts of the catalytic converter flange
  • The fixing of the exhaust front pipe on the clutch housing
  • The catalytic converter and the exhaust front pipe
  • Removal with a workshop crane
Figure b1bp2gyc

Use tool [4].

Tension the equipment 4.

Figure b1bp2gzc

Remove:

  • Nut (22) and washer
  • The 4 bolts (21)
  • The left-hand engine mounting (20)
Figure b1bp2h0c

Remove:

  • The nut (23)
  • The 3 bolts (24)
  • The engine mounting (25)

Remove the power unit assembly from under the vehicle (tilted power unit).

3. Refitting

Always fit new Nylstop nuts.

Position the engine-gearbox set.

Grease the inner part of the gearbox flexible mount with grease With grease G7.

Refit:

  • The left-hand engine mounting (20)
  • The 4 bolts (21)
  • Nut (22) and washer
  • The engine mounting (25)
  • The 3 bolts (24)
  • The nut (23)

Proceed in the reverse order to removal.

ESSENTIAL: Adhere to the tightening torques.

Check the gearbox level (see the relevant operation).

Check the sealing of the cooling system.

Refit the battery and its tray.

Switch on the ignition for 10 seconds.

Fill and bleed the cooling system (see the relevant operation).

Carry out the initialisation procedure for the injection ignition control unit.

Parts & tools for this job For 2000 Citroën Xsara

As an Amazon Associate we earn from qualifying purchases.