Removing - refitting: engine - gearbox (TU3JP)
- Make
- Citroën
- Model
- ZX Factory Workshop Manual
- Year
- 1991–1998
- Section
- Engine assembly › Removing - refitting: engine - gearbox (TU3JP)
Removing - refitting: engine - gearbox (TU3JP)
1. Recommended tools
[1] pliers for removing and refitting hose clips 9029-T.
[2a] final drive left-hand output oil seal fitting drift 7101-T.0 (*).
[2b] final drive right-hand output oil seal fitting drift 7101-T.G (*).
N.B.: (*) Supplement to kit 7116-T.
2. Removing
N.B.: This operation is carried out from above.
Disconnect the battery negative terminal.
Lift and support the vehicle.
Drain:
- The gearbox
- The cooling system (see the relevant operation)
Remove:
- The air filter assembly
- The battery
- The battery support
- The front wheels
- The drive shafts (see the relevant operation)
Disconnect the injection ECU.
Uncouple:
- The clutch cable
- Accelerator cable
- The gearbox control rods
- The air conditioning compressor (suspend the air conditioner compressor from the bodyshell of the vehicle)
Remove the "auxiliary equipment" drive belts (see the relevant operation).
Uncouple:
- The canister hose (under the front RH wing)
- The fuel supply pipe
- The heating supply water hoses (fixing on the bulkhead)
- The coolant circuit hoses Using tool [1]
Unplug:
- The engine electric harness
- The fusebox harnesses and relays
Uncouple:
- The braking servo pipe from the intake manifold (press on each side of the click-fit connection)
- The exhaust ball-joint
- The reaction link
Support the engine and gearbox assembly with a workshop engine hoist.
Remove:
- The engine brackets (on the L.H. and RH sides)
- The gearbox mounting
- The power unit assembly
3. Refitting
N.B.: Always fit new Nylstop nuts.
Use the drifts [2a]; [2b] to fit new final drive oil seals, having greased the space between the seal lips.
Coat the inside of the silentbloc of the gear box with type "G7" grease.
Fit the engine/gearbox assembly Using a workshop crane.
Refit:
- The power unit assembly
- The engine brackets (on the L.H. and RH sides)
- The gearbox mounting
Tighten the engine mounting brackets (see the relevant operation).
Couple up:
- The reaction link
- The exhaust ball-joint
- The braking servo pipe from the intake manifold
- The heating supply water hoses (fixing on the bulkhead)
- The coolant circuit hoses
- The canister hose (under the front RH wing)
- The fuel supply pipe
Connect:
- The engine electric harness
- The fusebox harnesses and relays
- The earth leads (fixing on the fuse box)
- The earth leads (on the gearbox)
- The fuse box wires (green wires and yellow wires)
Couple up:
- The air conditioning compressor
- The clutch cable
- Accelerator cable
- The gearbox control rods
Reinstall the "auxiliary equipment" drive belts.
Refit:
- The air filter assembly
- The cooling radiator
- The injection ECU and its support
- The drive shafts (see the relevant operation)
- The front wheels
Fill and top up the level of the following of the following elements:
- Gearbox
- Power steering reservoir (according to equipment)
- Cooling system
Bleed the cooling system (see the relevant operation).
Reconnect the battery negative terminal.
Return the vehicle to its wheels.
ESSENTIAL: Carry out the ECU initialisation procedure (see the relevant operation).
Parts & tools for this job For 1991 Citroën ZX
- PARTEngine gasket setSearch: Citroën ZX 1991 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.