daewoo Workshop Repair Guides

Daewoo Workshop Service and Repair Manuals

Power and Ground Distribution > < Starter Motor|Removal and Installation|Page 3333
Page 10
background image

13. Install the field coil connection to the starter terminal. Install the nut.

Tighten
Tighten the starter field coil connector nut to 8 Nm (71 lb.in).

14. Position the armature assembly into the field frame.
15. Place the shield on the armature and the field frame assembly.
16. Install the armature and the field frame assembly with the shield into the starter housing.

17. Position the commutator end frame/brush holder assembly lining up the end frame holes with the through-bolt holes in the housing.

18. Install the starter through-bolts.
19. Install the starter.

Tighten
Tighten the starter through-bolts to 6 Nm (53 lb.in).

Power and Ground Distribution > < Starter Motor|Removal and Installation|Page 3333