ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Connecting Rod, Engine|Removal and Installation|Page 1990 > < Connecting Rod, Engine|Removal and Installation|Page 1988
Page 15
background image

55. Install positive crankcase ventilation valve to LH valve cover and idle air control valve inlet tube and crankcase vent connector and hose to upper

intake manifold.

56. Insert oil level indicator tube into cylinder block and install LH valve cover retaining nut to retain oil level indicator tube. Tighten nut to 8-12 Nm

(71-106 inch lbs.).

57. Install outlet heater water hose on rear of RH cylinder head. Install and tighten two lower retaining bolts to 8-12 Nm (71-106 inch lbs.) and one

upper retaining bolt to 20-30 Nm (15-22 ft. lbs.).

58. Install power steering pump and tighten four retaining bolts to 20-30 Nm (15-22 ft. lbs.).
59. Install power steering reservoir to LH ignition coil bracket and install one stud bolt and two bolts. Tighten to 8-12 Nm (71-106 inch lbs.). Attach

reservoir supply hose to power steering pump and clamp.

60. Install water thermostat housing assembly. Attach hoses to water bypass tube and coolant inlet connection. Clamp both hoses.
61. Install accessory drive belt.
62. Tighten four water pump pulley bolts to 20-30 Nm (15-22 ft. lbs.).
63. Connect main emission vacuum control connector to fuel pressure regulator, intake manifold vacuum connection, EGR valve and EGR vacuum

Connecting Rod, Engine|Removal and Installation|Page 1990 > < Connecting Rod, Engine|Removal and Installation|Page 1988