freightliner Workshop Repair Guides

Freightliner Workshop Service and Repair Manuals

Oil Filter, Engine > < Engine Oil Cooler - Removal
Page 1
background image

Oil Cooler: Service and Repair
Engine Oil Cooler - Installation

INSTALLATION

1. Clean all engine mating surfaces.
2. Position the oil cooler and gasket. Install the fasteners and tighten to 10.8 Nm (96 in. lbs.).
3. Install the water pump housing assembly with new gasket. Tighten fasteners to 24.5 Nm (18 ft. lbs.).
4. Install the oil cooler coolant hose.
5. Install the power steering reservoir.
6. Install heater hoses at housing.
7. Install lower radiator hose at housing.
8. Install the charge air hose.
9. Install coolant reservoir and hoses.

10. Install the turbocharger.See: Powertrain Management/Fuel Delivery and Air Induction/Turbocharger/Service and Repair/Turbocharger -

Installation

11. Install air cleaner assembly See: Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and Repair.
12. Fill the coolant system
13. Connect the negative battery cable
14. Start engine, run until warm, turn the engine off, and inspect for leaks.

Oil Filter, Engine > < Engine Oil Cooler - Removal