33. Torque bolts according to the sequence and specifications shown in Figure 53.

34. Install both rear trailing links (new bolt (P/N 0-29261-400-0 and nut P/N 8-98181-530-0 provided in the kit) and secure but do not apply the final

torque. Final torque must be applied with the vehicle resting on the ground.

35. Remove both ratcheting straps installed in Step 5.

36. Lower the vehicle to the ground.

37. Raise the body up enough to remove the wooden blocks supports.

38. Install # 5 body mounts and torque bolts to specification. Torque: 50 N.m (37 lb ft)

39. Spray Noxudol 300 around the #4 body mount location.

40. Lower the Body down onto the frame and torque body mounts to specification. Torque: 50 Nm (37 lb ft)

41. Torque the both rear trailing link front mount mounting bolts to specification. Torque to 165 to 180 Nm (122-133 lbf ft.).

42. Raise the vehicle into the air and secure the following components:

a. Parking brake cable passenger side (2 points).

i.

New Bolt (2) P/N 0-28050-612-0 Torque: 6.5 to 8.5Nm (57 to 75 lbf in.)