Borrego 4WD V6-3.8L (2009)
22. Install the drive belt idler (A).
Tightening torque :
52.9 - 57.9N.m (5.4 - 5.9kgf.m, 39.1 - 42.7lb-ft)
23. Install the drive belt (A).
24. Install the LH/RH cylinder head cover.
(1) The hardening sealant located on the upper area between timing chain cover and cylinder head should be removed before assembling cylinder
head cover.
(2) After applying sealant (TB1217H), it should be assembled within 5 minutes.
Bead width :2.5mm (0.1in.)
(3) The firing and/or blow out test should not be performed within 30 minutes after the cylinder head cover was assembled.
(4) Install the cylinder head cover bolts as following method.
Tightening torque :
9.8 - 11.8N.m (1.0 - 1.2kgf.m, 7.2 - 8.7lb-ft)
CAUTION:
Do not reuse cylinder head cover gasket.