kia Workshop Repair Guides

Kia Workshop Service and Repair Manuals

Charging System - High Temperature Battery Drain|Page 3287 > < Charging System - High Temperature Battery Drain|Page 3285
Page 6
background image

13.

When "REPROGRAMMING COMPLETED" message is displayed, turn ignition key to the "OFF" position and disconnect Hi-Scan Pro from the
vehicle. Wait at least 20 seconds, start engine and verify normal operation.

NOTICE

If reprogramming did not complete properly or was interrupted, repeat process using the following procedure.

01/02MY MANUAL REPROGRAMMING

PROCEDURE:

14.

Turn ignition key to the "ON" position.

15.

Turn Hi-Scan Pro on and select "11. OPTIMA 2.4 01/02MY BATTERY DRAIN" and press the "ENTER" key.

Charging System - High Temperature Battery Drain|Page 3287 > < Charging System - High Temperature Battery Drain|Page 3285