landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Upper Ball Joint(64.15.07) > < Upper Arm(64.35.60)|Page 229
Page 3
background image

 

 

 

 

 

 

 

 

 

 

  

Align the bolt to the marks made previously.

  

Tighten the bolt to 175 Nm (129 lb.ft).

4 . 

  Tighten the upper arm front bolt to 175 Nm (129 lb.ft). 

5 . 

  Tighten the upper arm rear bolt to 275 Nm (203 lb.ft). 

6 . 

  Secure the wheel speed sensor lead. 

7 . 

  Secure the brake pad wear indicator sensor lead. 

8 . 

  Connect the height sensor link arm. 

9 . 

  Install the brake tube. 

  

Tighten the brake tube unions to 18 Nm (13 lb.ft).

10 . 

  

Bleed the brake system. For additional information, refer to 

Brake System Bleeding (70.25.02)

 

(Section 206-00)

11 . 

  Install the wheel and tire. 

  

Tighten the wheel nuts to 140 Nm (103 lb.ft).

12 . 

  Carry out the wheel alignment procedure. 

Upper Ball Joint(64.15.07) > < Upper Arm(64.35.60)|Page 229