landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

303-08C Engine Emission Control 2.7 Diesel|Specifications > < Exhaust Gas Recirculation Valve RH Removal|Page 1533
Page 4
background image

 

 

 

 

 

 

 

 

 

  Tighten the EGR valve retaining bolt to 10 Nm (7 lb.ft).

9 . 

  Connect the coolant outlet hose to the EGR valve.

10 . 

  Connect the coolant inlet hose to the EGR valve.

11 . 

  Connect the EGR valve electrical connector.

12 . 

  Install the fuel line retaining bracket. 

  

Install the fuel line retaining bracket retaining bolt and tighten to 10 Nm (7 lb.ft).

  

Secure the fuel lines. 

13 . 

  

Install the RH EGR valve outlet tube. For additional information, refer to 

Exhaust Gas Recirculation 

(EGR) Valve Outlet Tube (17.45.18)

 (Section 303-08) 

14 . 

  

Install the auxiliary battery tray. For additional information, refer to 

Auxiliary Battery Tray (76.10.31)

 

(Section 414-01) 

15 . 

  

Connect the battery ground cable. For additional information, refer to 

Specifications

 (Section 414-

00) 

16 . 

  

Refill and bleed the cooling system. For additional information, refer to 

Cooling System Draining, 

Filling and Bleeding (26.10.01)

 (Section 303-03) 

303-08C Engine Emission Control 2.7 Diesel|Specifications > < Exhaust Gas Recirculation Valve RH Removal|Page 1533