Range Rover (LM) V8-4.4L (2009)
23. Remove the fuel rail.
^
Remove the 4 Torx bolts.
^
Release the fuel injectors.
^
Remove and discard the fuel injector O-ring seals.
24. Remove the fuel injector housings.
^
Remove the 10 Torx screws.
^
Release the fuel injector housings and discard the gaskets.
Installation
1. Install the fuel injector housings.
^
Clean the component mating faces.
^
Install the gaskets.
^
Install the Torx screws.
2. Install the fuel rail.
^
Clean the component mating faces.
^
Install fuel injector O-ring seals.
^
Lubricate the O-ring seals with clean engine oil.
^
Tighten the 4 Torx bolts to 10 Nm (7 ft. lbs.).
3. Install the intake manifold MAP sensor housing.
^
Clean the component mating faces.
^
Tighten the 7 bolts to 10 Nm (7 ft. lbs.).
4. Install the intake manifold casting.
^
Clean the component mating faces.
^
Install the 4 bolts and tighten to 10 Nm (7 ft. lbs.).
5. Install the NVH pad to the RH side of the intake manifold.
6. Install the intake manifold assembly.
^
Install the gaskets.
7. Install the bolts.