GS 350 RWD V6-3.5L (2GR-FSE) (2007)
B.
RH bank:
(1)
Loosen tension from the timing chain by rotating the crankshaft.
NOTE:
Oil may spray out of the holes on top of the No. 1 camshaft bearing cap when rotating the crankshaft. Use shop rags to prevent any spray.
(2)
Rotate the crankshaft clockwise until the flat surface of the timing exhaust gear assembly faces the vertical position.
(3)
Remove the timing chain from the timing gear and rest it on the camshaft timing gear assembly temporarily.
30.
Remove the camshaft bearing cap.
A.
RH bank:
(1)
Check that the camshafts are in the neutral position shown in the illustration.
(2)
Uniformly loosen and remove the 9 camshaft bearing cap M6 bolts in the sequence shown in the illustration.
HINT:
Keep the camshaft horizontal while loosening the bearing cap bolts.
(3)
Uniformly loosen and remove the 9 camshaft bearing cap M8 bolts in the sequence shown in the illustration.
(4)
Remove the 6 camshaft bearing caps.
B.
LH bank: