GS 350 RWD V6-3.5L (2GR-FSE) (2007)
b. Connect the 6 ignition coil connectors.
c. Attach the 3 wire harness clamps and connect the noise filter connector.
2. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
3. INSTALL NO. 2 VENTILATION HOSE
4. INSTALL V-BANK COVER
5. INSTALL ENGINE ROOM SIDE COVER LH
6. INSTALL ENGINE ROOM SIDE COVER RH
7. INSTALL COOL AIR INTAKE DUCT SEAL
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
9. PERFORM INITIALIZATION
a. Perform initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.