GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
3. INSTALL NO. 6 BATTERY CARRIER PANEL
a. Install the No. 6 battery carrier panel with the 7 bolts.
Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)
CAUTION: Wear insulated gloves.
NOTE: Do not drop the bolts in the cooling air inlet.
4. INSTALL BATTERY CARRIER SUB-ASSEMBLY
a. Install the battery carrier sub-assembly with the 2 bolts and 2 nuts.
Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)
CAUTION: Wear insulated gloves.
b. Connect the 3 connectors and 2 clamps.
CAUTION: Wear insulated gloves.