lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Component Inspection|Page 3416 > < Component Inspection|Page 3414
Page 5
background image

3. INSTALL NO. 6 BATTERY CARRIER PANEL

a. Install the No. 6 battery carrier panel with the 7 bolts.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

CAUTION:  Wear insulated gloves.

NOTE:  Do not drop the bolts in the cooling air inlet.

4. INSTALL BATTERY CARRIER SUB-ASSEMBLY

a. Install the battery carrier sub-assembly with the 2 bolts and 2 nuts.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf)

CAUTION:  Wear insulated gloves.

b. Connect the 3 connectors and 2 clamps.

CAUTION:  Wear insulated gloves.

Component Inspection|Page 3416 > < Component Inspection|Page 3414