GS 450h V6-3.5L (2GR-FSE) Hybrid (2007)
2. INSTALL NO. 1 STEERING RACK BOOT
(a)
Apply silicon grease to the inside of the small opening of the boot (LH side).
(b) Temporarily install a new clamp to the large opening of the boot (LH side) at the position shown by arrow (A).
NOTICE:
^
Use a new clamp.
^
Do not expand the clamp more than necessary for installation, as the tightening force of the clamp becomes uneven. If overexpanded,
rust may occur if water enters the clearance between the boot and rack housing.
^
Do not deform the steering rack boot clamp.
^
Use only the supply parts which are applicable to the vehicle to secure the boot.
HINT:
After disengaging the claw of a new clamp, temporarily install it from the end without expanding the clamp diameter more than necessary.
(c)
Install the No. 1 rack boot (LH side) to the groove on the rack housing.
NOTICE:
^
Be careful not to damage or twist the boot.
^
Do not damage the steering rack boot (LH side).
^
Ensure that the steering rack boot No. 1 clamp is installed before installing the steering rack boot No. 1 (LH side) to the rack housing.
(d) Install the RH side by using the same procedure as for the LH side.