Power plant frame
- Make
- Mazda
- Model
- MX-5 (NA) Factory Workshop Manual
- Year
- 1990–1992
- Section
- B Engine (B) › Power plant frame
EnginePower plant frame
Power plant frame
- Install the power plant frame. (Refer to page J–45.)
Engine mount nut
- Tighten the engine mount nuts.
Tightening torque:
57—78 Nm (5.8—8.0 m·kg, 42—58 ft·lb)
Propeller shaft, speedometer cable, and shift knob
- Install the propeller shaft, speedometer cable, and shift knob. (Refer to page J–45.)
Transmission harness
- Connect the transmission harness.
Clutch release cylinder
- Install the clutch release cylinder.
Tightening torque:
19—25 N·m (1.9—2.6 m·kg, 14—19 ft·lb)
Exhaust pipe
- Install the exhaust pipe assembly. (Refer to page F–115.)
Parts & tools for this job For 1990 Mazda MX-5
- PARTEngine gasket setSearch: Mazda MX-5 1990 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.