mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Transmission Position Switch/Sensor, A/T > < Oil Cooler Flushing|Page 2448
Page 4
background image

(5) Put the radiator into water slowly with the radiator tester connected.
(6) Inspect for air leakage.

Radiator Installation Note 
1. The ATX oil cooler flushing must be performed whenever a transaxle is removed for service because the existing fluid may be contaminated, and

to prevent contamination of new fluid. The flushing must be performed after installation of the overhauled or replaced transaxle. 

Oil Hose Installation Note 

1. Apply compressed air to cooler-side opening more than 1 minute, and blow any remaining grime and foreign material from the cooler pipes.

2. Align the marks, and slide the oil hose onto the oil pipe until it is fully seated as shown.

3. Install the hose clamp onto the hose.

^

If reusing the hose, install a new hose clamp exactly on the mark left by the previous hose clamp.

4. Verify that the hose clamp does not interfere with any other components.

Transmission Position Switch/Sensor, A/T > < Oil Cooler Flushing|Page 2448