mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Air Cleaner Intake Pipe Removal/Installation|Page 2926 > < Inertia Fuel Shutoff Switch|Locations|Page 2921
Page 1
background image

Intake Air Duct: Service and Repair
Air Cleaner Intake Pipe Removal/Installation

-
AIR CLEANER INTAKE PIPE REMOVAL/INSTALLATION - HYBRID

1. Remove the battery tray. See  See: Starting and Charging/Battery/Battery Tray/Service and Repair.

2. Remove the bolt and the Air Cleaner (ACL) intake pipe.

-

To install, tighten to 8 Nm {0.8 kgf-m, 71 in-lbf}.

3. To install, reverse the removal procedure.

NOTE:Make sure that the front sponge seal of the intake pipe is seated on the shroud panel. 

Air Cleaner Intake Pipe Removal/Installation|Page 2926 > < Inertia Fuel Shutoff Switch|Locations|Page 2921