mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Evaporative Emission Control Canister > < Purge Control Solenoid|Page 2834
Page 2
background image

Fig. 1 Purge Control Solenoid Valve Inspection (Operation)

4.

Check for vacuum leak to opposite port when voltage is supplied and not supplied as per Fig. 1 

5.

Using an ohm meter, check the resistance between the terminals.

Resistance 
36 - 44 ohms @ 68° F

HARNESS TEST 

1.

Disconnect the solenoid connector and turn the key to the ON position.

2.

Using a voltmeter, measure voltage between the harness connector terminal 1 and ground.

Voltage: 
System voltage.

3.

Turn the key to the OFF position and disconnect the ECM connector. 

4.

Using an ohmmeter, check for continuity between the ECM harness connector terminal 9 and the solenoid harness connector terminal 2.

Continuity: 
Should exist.

5.

Using an ohmmeter, check for continuity between the solenoid harness connector terminal 2 and ground.

Continuity: 
Should not exist.

If any of the previous tests produce unsatisfactory results, the harness will need to be repaired or replaced. Once repairs have been completed, road
test the vehicle to confirm that the repair has corrected the problem.

If the same problem reoccurs, it is possible that there is an intermittent failure of the component or the ECM. Check for looseness at all harness
junctions and test for an intermittent failure.

Evaporative Emission Control Canister > < Purge Control Solenoid|Page 2834