mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 1962 > < Initial Inspection and Diagnostic Overview|Page 1960
Page 36
background image

STEP 6. Check the wiring harness between sunroof motor assembly connector D-06 and fusible link (2).

NOTE:  Also check intermediate connectors C-31, C-89 and joint connector C-78. If intermediate connector C-31, C-89 and joint connector C-78 is
damaged, repair or replace the connector as described in Harness Connector Inspection.

Q: Is the wiring harness between sunroof motor assembly connector D-06 and fusible link (2) in good condition?

YES: No action to be taken.

NO: Repair the wiring harness. The system should communicate with the sunroof motor assembly (sunroof-ECU) normally.

STEP 7. Check sunroof motor assembly connector D-06 by backprobing in order to the ignition switch (IG2) line of the power supply circuit to
the sunroof motor assembly.

1.  Measure at sunroof motor assembly connector D-06 without disconnecting it.
2. Turn the ignition switch to the "ON" position.

3. Measure the voltage between terminal 2 and ground by backprobing.

-

The measured value should be approximately 12 volts (battery positive voltage).

Q: Does the measured voltage correspond with this range?

YES: Go to Step 10.

NO: Go to Step 8.

 

STEP 8. Check sunroof motor assembly connector D-06 for damage.

Q: Is sunroof motor assembly connector D-06 in good condition?

Initial Inspection and Diagnostic Overview|Page 1962 > < Initial Inspection and Diagnostic Overview|Page 1960