mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Main Relay (Computer/Fuel System) > < Diagram Information and Instructions|Page 2963
Page 1
background image

Ignition Monitoring Shunt: Testing and Inspection

Ignition Switch (M/T) Circuit

1. With the ignition switch in the START position, measure the Voltage at ECM terminal 51--should be 8 Volts or more.
2. Verify ECM terminal 71 continuity to ground.
3. Verify ECM terminal 51 continuity to the ignition switch START circuit.

Main Relay (Computer/Fuel System) > < Diagram Information and Instructions|Page 2963