nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

ABS/TCS - ABS/VDC Lamp ON/DTC's C1161/C1162|Page 4547 > < ABS/TCS - ABS/VDC Lamp ON/DTC's C1161/C1162
Page 2
background image

NOTE:

The C-III computer automatically gets applicable ECM reprogramming data during ASIST synchronization.

^ C-III PCMCIA Card Adapter is installed.

^ C-III Security Card is installed.

^ A screen print for Warranty documentation can be done from C-III during this process while still cable-connected to the vehicle.

1. Use the USB cable to connect the Vehicle Interface (VI) to the C-III computer and then connect the Vito the vehicle.

CAUTION

2. Connect the AC Adapter to the C-III computer.

CAUTION

3. Connect a battery charger to the vehicle battery:

^ Set the battery charger at a low charge rate.

NOTE:

The GR-8 (Battery and Electrical Diagnostic Station) set to "Power Supply" mode is recommended.

CAUTION

4. Turn the ignition ON with the engine OFF.

^ The engine must be OFF (not running) during the reprogramming procedure.

ABS/TCS - ABS/VDC Lamp ON/DTC's C1161/C1162|Page 4547 > < ABS/TCS - ABS/VDC Lamp ON/DTC's C1161/C1162