porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 1412 > < Removal and Replacement|Page 1410
Page 4
background image

12. Fit 3 ignition coils: Tighten 6 M6 x 25 pan-head screws (hexagon socket a/f 5).

Tightening torque 10 Nm (7.5 ftlb.)

13. Fit holder for rear muffler -2-. Fit cable plugs of the ignition coils and of the magnetic hydraulic valves. Screw in and tighten 4 hexagon-head

bolts:. top 2 M8 x 30, bottom 2 M8 x 25.

Figure shows engine side 1 - 3

Tightening torque: 23 Nm (17 ftlb.)

Information
 -

Fastening nuts, hexagon-head bolts and seals for the exhaust manifold must be replaced.

14. Fit the exhaust manifold. To do this, put three new M8 fastening nuts and a new metal seal on the catalytic converter flange. Then fasten the

exhaust manifold on the cylinder head with six new M8 x 28 hexagon-head bolts and a new seal.

15. Tighten 9 M8 screw connections with the prescribed torque.

Tightening torque: 23 Nm (17 ftlb.)

16. Raise the engine again and then tighten the two collar nuts (a/f 18) on the rear engine mounts. Check hoses and cables for damage.

Tightening torque 85 Nm (63 ftlb.)

17. Fit shield: Tighten 2 M6 x 16 hexagon-head bolts.

Tightening torque 10 Nm (7.5 ftlb.)

18. Refit rear muffler.
19. Fill in engine oil and check the engine oil level (top up if necessary).
20. Connect the battery.

Removing cylinder head cover - cylinder bank 4 - 6

1. Remove the ground cable from the cylinder head. Unscrew 1 M8 hexagon-head bolt.
2. Pull the 2 cable plugs off the oil pressure sensor.
3. Remove the shield: Unscrew 2 M6 x 16 hexagon-head bolts. Pull out the shield to side.

Removal and Replacement|Page 1412 > < Removal and Replacement|Page 1410