porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 2146 > < Procedures|Page 2144
Page 3
background image

1. Replace O-rings of the injection valves and press the valves into the fuel collection pipe -A-. The O-rings can be sprayed, e.g. with silicone spray,

for easier assembly. Fit the retainers -B- of the injection valves correctly (they must snap into place).

2. Push the fuel collection pipe complete with injection valves into the intake pipe and insert the two M6 x 12 hexagon-head bolts of the fuel

collection pipe into the intake pipe. Make sure that the loose wiring harness is not trapped.

3. Tighten both M6 x 12 hexagon-head bolts with the correct tightening torque.

Tightening torque 10 Nm (7.5 ft.lb.)

4. Correctly route the wiring harness of the injection valves and clip it into the cable retainers on the fuel collection pipe -2-.

5. Push cable plugs onto the injection valves by pushing on the cable plugs until they audibly engage.

Steps 6 - 10 refer to the adjacent Figure.

6. Push on cable plug of the switch-over valve above the generator -6-.
7. Push on cable plug of the coolant level sensor -5-.
8. Push coolant hoses -3 and 4- onto the connections on the coolant expansion tank and fasten them in place with spring band clamps using a

mounting tool for spring band clamps.

9. Fit plug connection of the tank vent line to the tank vent -2- by pressing the rapid-action coupling onto the connection line to the tank valve.

10. Fit plug connection of the fuel line by pressing the rapid-action coupling -1- onto the line. Clip in fuel line at the plastic clip of the coolant

expansion tank.

11. Raise the engine again with the jack and then tighten the two collar nuts (a/f 18) on the engine mounts with the correct torque.

Tightening torque 85 Nm (63 ft.lb.)

12. Install the secondary air pump. To do so, connect the cable plugs, tighten the upper hexagon nut, tighten the two M6 hexagon-head bolts at the

bottom and insert the cable into the plastic clip. Push connecting hose onto the connection.
Tightening torque of M6 screw connections 10 Nm (7.5 ft.lb.)

13. Install air cleaner housing.
14. Top up coolant and bleed cooling system.
15. Connect the battery.

Procedures|Page 2146 > < Procedures|Page 2144