porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Testing Each One Separately|Page 1491 > < Testing Each One Separately
Page 1
background image

Wastegate: Testing and Inspection
Testing Both Together

Procedure 

1. Fasten gauge holder to left turbocharger flange

-

Unscrew hexagon nut on turbocharger flange and fasten gauge holder tool No. VW387 to flange.

-

Aline tracer pin with pushrod.

-

Set gauge with pretension to 0.

2. Fasten gauge holder to right side.

-

Fasten second gauge holder to the ball clamp with a vice grip wrench.

-

Make a tracer pin (shop made)

-

The tracer pin (length approx. 10 cm) must be bent accordingly in the exhaust crosspipe area.

-

Align tracer pin with pushrod.

-

Set gauge with pretension to 0.

3. Connect Pressure gauge.

-

Connect hand pump and pressure gauge together with branch pieces.

-

Hang pressure gauge on stabilizer.

Testing Each One Separately|Page 1491 > < Testing Each One Separately